• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • AI SuperconnectorNEW
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • AI SuperconnectorNEW
  • Settings
  • RSS Feeds
PublishGo to AppAI Superconnector
    Quantisnow Logo

    © 2025 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEW
    Legal
    Terms of usePrivacy policyCookie policy

    Ero Copper Intercepts 115 Meters at 0.98% CuEq¹ in Deepest Hole Drilled to Date at Furnas Copper-Gold Project – Phase 2 Drill Program to be Completed in Early Q4 2025

    9/18/25 7:00:00 AM ET
    $ERO
    Metal Mining
    Basic Materials
    Get the next $ERO alert in real time by email

    VANCOUVER, British Columbia, Sept. 18, 2025 (GLOBE NEWSWIRE) -- Ero Copper Corp. (TSX:ERO, NYSE:ERO) ("Ero" or the "Company") is pleased to announce the remaining assay results from its 28,000-meter Phase 1 drill program at the Furnas Copper-Gold Project ("Furnas" or the "Project"), located in the Carajás Mineral Province in Pará State, Brazil.

    Complete results from the Phase 1 program are highlighted by intercepts that continue to demonstrate high-grade continuity throughout the deposit as well as significantly extend the known limits of mineralization within the high-grade zones (greater than 1% CuEq1) to depth. To date, mineralization has been extended to a depth of approximately 950 meters down-dip from surface and remains open.

    New Phase 1 program drill results are highlighted by:

    • FURN-DD-00322: 115 meters at 0.76% copper and 0.47 grams per tonne ("gpt") gold (0.98% CuEq1), including 46 meters at 0.81% copper and 0.56 gpt gold (1.11% CuEq1) and 28 meters at 0.91% copper and 0.71 gpt gold (1.25% CuEq1). This is the deepest hole drilled to date in the Southeast zone, drilled approximately 220 meters down-dip from the previously known extent of mineralization and 950 meters down-dip from surface.
    • FURN-DD-00305: 103 meters at 0.88% copper and 0.80 gpt gold (1.26% CuEq1), including 27 meters at 1.04% copper and 1.18 gpt gold (1.60% CuEq1), demonstrating continuity of known mineralization within the high-grade envelope of the Southeast zone and supporting conversion of the current mineral resource.
    • FURN-DD-00321: 115 meters at 0.47% copper and 0.27 gpt gold (0.60% CuEq1), including 8 meters at 1.13% copper and 0.49 gpt gold (1.36% CuEq1), the deepest hole drilled in the Northwest zone, approximately 650 meters down-dip from surface, demonstrating further down-dip potential in the Northwest zone, which has had limited extensional drilling to date in comparison to the Southeast zone.
    • FURN-DD-00300: 80 meters at 1.02% copper and 0.36 gpt gold (1.19% CuEq1), including 28 meters at 1.67% copper and 0.49 gpt gold (1.90% CuEq1), demonstrating continuity within the high-grade envelope of the Northwest zone and supporting conversion of the current mineral resource.



    1. Where applicable, copper equivalent ("CuEq") in this press release has been calculated using the following formula: Cu grade + (Au grade x 0.03215 x ($1,900 gold price x 61.50% gold metallurgical recovery / (0.01 x $9,259/tonne copper price x 85.00% copper metallurgical recovery)).

    Step-out drilling during the Phase 1 program has now extended the known limits of mineralization to a depth of approximately 950 meters down-dip from surface. The National Instrument 43-101 ("NI 43-101") compliant mineral resource estimate for the Project is based on an average historical depth of drilling of 300 meters (vertical), with a maximum localized down-dip depth from surface of 580 meters. For additional information on the Project's last published mineral resource estimate, please refer to the Company's press release dated October 2, 2024.

    Drilling at Furnas continues with eight drill rigs currently on site. Ero expects to complete the 17,000-meter Phase 2 drill program in early Q4 2025, approximately three months ahead of schedule.

    "The full results from the 28,000-meter Phase 1 drill program are highly encouraging and reinforce the potential for Furnas to be a large-scale, long-life, high-grade copper and gold mining operation that we believe will fundamentally transform the Company and add considerable value for our partner, Vale Base Metals" said Makko DeFilippo, President and Chief Executive Officer. "The Phase 1 program has not only confirmed continuity of high- grade mineralization, but also exceeded our expectations in demonstrating high-grade mineralization well beyond the down-dip limits of the last published mineral resource estimate."

    "This year, the majority of our exploration efforts have been dedicated to advancing Furnas as the next leg of our growth strategy. Following the cumulative 45,000-meter Phase 1 and 2 drill programs, and with eight drill rigs currently on site to support the Phase 3 program and ongoing engineering studies, we are well-positioned to continue building momentum."

    The complete results from the Phase 1 drill program will serve as the foundation for an updated NI 43-101 compliant mineral resource estimate as well as a preliminary economic assessment ("PEA") of the Project. The PEA, which was initiated earlier this year, remains on track for completion during the first half of 2026. Please refer to the Company's July 10, 2025 press release in conjunction with the current release for complete results of the Phase 1 program.

    ABOUT THE FURNAS COPPER-GOLD PROJECT

    Furnas is an iron oxide copper-gold deposit located approximately 50 kilometers southeast of Vale Base Metal's ("VBM") Salobo operations and approximately 190 kilometers northeast of Ero's Tucumã Operation. Covering an area of approximately 2,400 hectares, the Project sits within fifteen kilometers of extensive regional infrastructure, including paved roads, an industrial-scale cement plant, a power substation and Vale S.A.'s railroad loadout facility.

    In July 2024, the Company signed a definitive earn-in agreement ("Agreement") with Salobo Metais S.A, a subsidiary of VBM, to earn a 60% interest in the Project upon completion of several exploration, engineering and development milestones over a five-year period. In exchange for its 60% interest, Ero will solely fund a phased work program during the earn-in period and grant VBM up to an 11.0% "free carry" on future Project construction capital expenditures. For additional details on the key terms and execution of the Agreement, please refer to the Company's press releases dated October 30, 2023 and July 22, 2024.

    Prior to the commencement of the Phase 1 drill program, the Company published an initial NI 43-101 compliant mineral resource estimate on the Project, based on approximately 90,000 meters of historical drilling. This estimate underscored the significant potential of the Project. Using a 1.00% copper equivalent cut-off grade, the mineral resource estimate, effective June 30, 2024, totaled:

    • Indicated Mineral Resource: 35.2 million tonnes grading 1.04% copper and 0.69 gpt gold (1.36% CuEq1), containing an estimated 364,700 tonnes of copper and 775,300 ounces of gold
    • Inferred Mineral Resource: 61.3 million tonnes grading 1.06% copper and 0.63 gpt gold (1.36% CuEq1), containing an estimated 647,400 tonnes of copper and 1,235,600 ounces of gold



    For additional information on the Project's mineral resource estimate, please see the Company's press release dated October 2, 2024 as well as the corresponding technical report titled "Furnas Copper Project – Para State, Brazil – NI 43-101 Mineral Resource Estimate Technical Report", dated November 18, 2024 with an effective date of June 30, 2024, prepared for the Company by Anderson Gonçalves Candido, FAusIMM of RPMGlobal Canada Limited ("RPM").



    1. Where applicable, copper equivalent ("CuEq") in this press release has been calculated using the following formula: Cu grade + (Au grade x 0.03215 x ($1,900 gold price x 61.50% gold metallurgical recovery / (0.01 x $9,259/tonne copper price x 85.00% copper metallurgical recovery)).

    Furnas Plan View Map, including drill collar locations.

    Figure 1: Furnas Plan View Map, including drill collar locations. Rock types include:

    Abbreviation Rock Type
    HCS Calcic-sodic hydrothermal rock
    GRA Granite
    DIO Diorite
    RCL HD Chlorite-rich hydrothermal rock
    GMF HD Grunerite-garnet-magnetite hydrothermal rock
    GMF HD-2 Grunerite-garnet-magnetite hydrothermal rock
    XTA Aluminous schist
    RSL Host Quartz-rich rock
    GMF RSL Magnetite-rich hydrothermally altered rock / Quartz-rich rock
       

    Cross section within the high-grade SE Zone of Furnas.

    Figure 2: Cross section within the high-grade SE Zone of Furnas. Rock types include:

    Abbreviation Rock Type
    HDM Magnetite-rich hydrothermally altered rock
    RSL Host Quartz-rich rock
    GMF RSL Magnetite-rich hydrothermally altered rock / Quartz-rich rock
    XTA Aluminous schist
    RCL HD Chlorite-rich hydrothermal rock
       

    Cross section within the high-grade NW Zone of Furnas.

    Figure 3: Cross section within the high-grade NW Zone of Furnas. Rock types include:

    Abbreviation Rock Type
    GRA Granite
    HDCS Calcic-sodic undifferentiated mafic rock
    HDM Magnetite-rich hydrothermally altered rock
    RSL Host Quartz-rich rock
    GMF RSL Magnetite-rich hydrothermally altered rock / Quartz-rich rock
    RCL HD Chlorite-rich hydrothermal rock
       



    DRILL RESULTS - SOUTHEAST ZONE

    Hole IDFrom (m)To (m)Length (m)Cu (%)Au (g/t)CuEq (%)%Cu Grade

    x
    Thickness
            
    FURN-DD-00280458523650.790.400.9851.2
    incl491523320.850.541.1127.2
    FURN-DD-002814885991110.630.400.8270.0
    incl519539200.810.621.1116.2
    FURN-DD-00283429523930.800.320.9574.7
    incl429447181.510.461.7326.7
    incl489512231.330.711.6730.5
    FURN-DD-00291174271970.500.250.6248.7
    incl174190170.930.351.1015.4
    incl252271190.750.390.9414.4
    FURN-DD-00292196248520.570.560.8429.7
    incl212248360.590.680.9121.2
    incl235248130.630.951.088.1
    FURN-DD-00294556639830.560.390.7546.2
    incl570617470.630.460.8529.3
    FURN-DD-00296119200810.420.130.4834.1
    incl182200180.890.231.0016.2
    FURN-DD-00297297389920.910.651.2283.9
    incl297344471.040.301.1849.0
    incl359389301.101.481.8133.1
    FURN-DD-00298329423940.900.571.1784.6
    incl353379261.340.631.6434.8
    incl399421220.990.981.4621.8
    FURN-DD-00299422483620.760.571.0346.8
    incl444460160.921.051.4214.7
    FURN-DD-00302315366510.740.380.9237.5
    incl334361270.970.421.1725.7
    FURN-DD-00303243289461.310.441.5260.8
    incl260289291.670.501.9148.8
    FURN-DD-00304370444740.951.041.4570.3
    incl391441501.001.401.6750.5
    FURN-DD-003053524551030.880.801.2690.6
    incl408435271.041.181.6028.1
    FURN-DD-00307290310200.690.200.7913.8



    Hole IDFrom (m)To (m)Length (m)Cu (%)Au (g/t)CuEq (%)%Cu Grade

    x Thickness
            
    FURN-DD-00307355407520.630.350.8032.8
    FURN-DD-0030991147561.280.241.3971.7
    incl116139231.860.312.0142.8
    FURN-DD-00310121150290.800.360.9723.2
    FURN-DD-00311356419630.740.450.9546.6
    incl361389280.880.531.1324.6
    FURN-DD-00313279364850.610.400.8051.9
    FURN-DD-00314113167540.720.420.9238.9
    incl149167181.220.791.6022.0
    FURN-DD-003164925921000.670.360.8467.0
    incl540578380.740.671.0628.1
    FURN-DD-00318150196461.230.521.4856.6
    FURN-DD-00319125158331.650.381.8354.5
    FURN-DD-003226477611150.760.470.9887.3
    incl661707460.810.561.1137.3
    incl733761280.910.711.2525.8
    FURN-DD-00323167229620.910.521.1656.3
    FURN-DD-00324323385620.800.591.0849.6
    incl323339161.140.921.5818.2
    FURN-DD-00325457522650.720.430.9346.8
    incl459469101.130.731.4811.3
    FURN-DD-00327138192540.680.420.8836.7
    incl150175251.020.531.2725.5
    FURN-DD-00328473530570.700.470.9239.9
    incl47348181.060.721.408.5
    FURN-DD-00330421466440.820.501.0636.4
    incl421451300.980.541.2429.3
    FURN-DD-0033174115420.610.921.0525.4
    incl9410281.271.772.1110.5



    DRILL RESULTS - NORTHWEST ZONE

    Hole IDFrom (m)To (m)Length (m)Cu (%)Au (g/t)CuEq (%)%Cu Grade

    x Thickness
            
    FURN-DD-00295314341270.880.230.9923.8
    FURN-DD-00295389422330.560.910.9918.5
    FURN-DD-00300290370801.020.361.1981.6
    incl322350281.670.491.9046.8
    FURN-DD-00301425490650.720.450.9346.8
    incl425453280.980.601.2727.4
    FURN-DD-00306169244750.580.150.6543.5
    FURN-DD-00306317345280.630.580.9117.6
    FURN-DD-00308130223930.640.801.0259.5
    FURN-DD-00312207271641.180.791.5675.5
    incl239270311.390.811.7843.1
    FURN-DD-00315150197470.900.641.2142.3
    FURN-DD-00320194234400.830.751.1933.2
    FURN-DD-003214906051150.470.270.6054.1
    incl56457281.130.491.369.0
    FURN-DD-00326150193430.690.671.0129.8
    incl164174100.831.021.328.3
    FURN-DD-00329213237240.480.290.6211.5
    incl31232080.591.241.184.9



    DRILL HOLE INFORMATION - SOUTHEAST ZONE

    Hole IDEastingNorthingElevationAzimuthDipLength (m)
           
    FURN-DD-00280611,9539,346,66034920060589.8
    FURN-DD-00281612,0879,346,65734820060704.6
    FURN-DD-00283612,2539,346,43332020060570.3
    FURN-DD-00291611,4459,346,43845820060338.2
    FURN-DD-00292611,3039,346,60041320060374.8
    FURN-DD-00294612,0299,346,78531220060682.5
    FURN-DD-00296611,9839,346,21142720060315.1
    FURN-DD-00297611,9929,346,33742120060481.8
    FURN-DD-00298611,9619,346,39741520060481.6
    FURN-DD-00299612,4659,346,17632120060568.5
    FURN-DD-00302612,2909,346,13236720060426.2
    FURN-DD-00303612,0179,346,25841420060400.4
    FURN-DD-00304612,1399,346,42834520060501.0
    FURN-DD-00305612,1939,346,40133720060651.8
    FURN-DD-00307612,2269,346,26733320060497.7
    FURN-DD-00309612,0299,346,10641720060305.2
    FURN-DD-00310612,2139,345,97240720055214.7
    FURN-DD-00311612,3249,346,22633320055464.0
    FURN-DD-00313612,2269,346,26733320050415.5
    FURN-DD-00314611,8869,346,19346120060254.5
    FURN-DD-00316612,2699,346,51232220060646.0
    FURN-DD-00318612,2519,345,97339420055253.6
    FURN-DD-00319612,0589,346,06740720060236.7
    FURN-DD-00322612,1829,346,92327720060508.8
    FURN-DD-00323612,1649,346,05240220065321.7
    FURN-DD-00324612,5969,345,95832220060453.3
    FURN-DD-00325612,4069,346,27432120060570.5
    FURN-DD-00327612,1639,346,05140220050297.4
    FURN-DD-00328612,3629,346,34129520060555.4
    FURN-DD-00330612,5059,346,14130220060528.1
    FURN-DD-00331611,9679,346,16343820060252.2



    DRILL HOLE INFORMATION - NORTHWEST ZONE

    Hole IDEastingNorthingElevationAzimuthDipLength (m)
           
    FURN-DD-00295607,5259,348,16723620060476.5
    FURN-DD-00300607,6309,348,14424120060551.5
    FURN-DD-00301607,5549,348,27323620060666.7
    FURN-DD-00306607,5309,348,07324320060470.0
    FURN-DD-00308607,6899,347,91929220060414.9
    FURN-DD-00312607,7569,347,98227520060368.4
    FURN-DD-00315607,7669,347,88531020060371.9
    FURN-DD-00320607,8319,347,91530320050349.9
    FURN-DD-00321607,6989,348,38122720060725.4
    FURN-DD-00326607,80699,347,84233320055304.9
    FURN-DD-00329607,4779,348,07424120060363.8



    NOTE ON NI 43-101 COMPLIANT TECHNICAL REPORT

    The conversion of drill results presented in this press release into NI 43-101 compliant mineral resources or mineral reserves requires additional work and analysis that remains ongoing. Additional drilling and technical work are required to determine whether the results related to down-dip intercepts will be included in future NI 43-101 compliant mineral resource or reserve estimates.

    QUALIFIED PERSON

    Mr. Cid Gonçalves Monteiro Filho, SME RM (04317974), MAIG (No. 8444), FAusIMM (No. 329148) of Ero Copper, a Qualified Person as defined in NI 43-101, has reviewed this press release on behalf of the Company and has approved the scientific and technical information contained in this press release.

    QUALITY ASSURANCE & QUALITY CONTROL

    Current QA/QC Program

    At the Project, the Company is currently drilling with third-party contracted core drill rigs, operated by Major Drilling Group International Inc. and Drillgeo Geologia e Sondagem Ltda. – independent contractors engaged since October 2024. Drill core is logged, photographed and split in half using a diamond core saw at the Company's core logging and storage facilities. Half of the drill core is retained on site and the other half-core is used for analysis, with samples collected at a minimum of 1.5 meters and a maximum of 2.5 meters with an average length of 2.0 meters. Sampling commences at least 3.0 meters before the start of the mineralized zone and continues at least 3.0 meters beyond the limit of the mineralized zone. Sample collection is performed at the Company's logging facilities with all sample preparation performed at ALS Brasil Ltda.'s laboratory, located in Parauapebas (PA), Brazil, who is independent of the Company. Samples are analyzed by the certified laboratory of ALS Peru S.A., who is independent of the Company. Copper content is determined by four-acid digestion followed by ICP-MS analysis, while gold content is analyzed using fire assay with ICP-AES. When copper grades exceed 1%, Atomic Absorption Spectroscopy is used to determine it. All sample results from the Phase 1 drill program have been monitored through a quality assurance and quality control ("QA/QC") program that includes adherence to the internal operational procedures and the insertion of certified standards, blanks and duplicates at a rate of three standards, one coarse blank, one fine blank, one field duplicate, one coarse duplicate, and one pulp duplicate for every 50 total samples, yielding a blended QC rate of approximately 16%.

    QA/QC Validation

    The QA/QC validation process undertaken for the Phase 1 drill program of the Project is consistent with the process set out in the NI 43-101 technical report with respect to Furnas , titled "Furnas Copper Project – Para State, Brazil – NI 43-101 Mineral Resource Estimate Technical Report", dated November 18, 2024 with an effective date of June 30, 2024 and Ero's internal guidelines and best practices.

    NOTES ON MINERAL RESOURCES

    The Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Definition Standards (2014) were used for reporting the Project's mineral resource estimate, which is effective as at June 30, 2024 and presented on a 100% ownership basis. All figures have been rounded to the relative accuracy of the estimates. Summed amounts may not add due to rounding. Mineral resources that are not mineral reserves do not have a demonstrated economic viability.

    Mr. Anderson Gonçalves Candido, FAusIMM of RPM completed a review of the mineral resource estimate using an appropriate validation process. The mineral resource estimate process was also supervised and reviewed by Mr. Cid Gonçalves Monteiro Filho, SME RM (04317974), MAIG (No. 8444), FAusIMM (No. 329148) who is the Manager, Resources & Reserves of the Company and a "qualified person" within the meanings of NI 43-101.

    Mineral resources have been estimated using a copper price of US$9,259/tonne, a gold price of US$1,900/oz, a USD:BRL foreign exchange rate of 5.10, and copper and gold metallurgical recovery rates of 85.00% and 61.50%, respectively. The estimation was constrained using Datamine's Mineable Shape Optimizer ("MSO") at a 0.55% break-even copper cut-off grade. Mineral resources were estimated using ordinary kriging within a 25-meter by 25-meter by 4- meter block size (X, Y, Z), with a minimum sub-block size of 6.25 meters by 6.25 meters by

    2.0 meters.

    ABOUT ERO COPPER CORP

    Ero Copper is a high-margin, high-growth copper producer with operations in Brazil and corporate headquarters in Vancouver, B.C. The Company's primary asset is a 99.6% interest in the Brazilian copper mining company, Mineração Caraíba S.A. ("MCSA"), owner of the Company's Caraíba Operations, which are located in the Curaçá Valley, Bahia State, Brazil, and the Tucumã Operation, an open pit copper mine located in Pará State, Brazil. The Company also owns 97.6% of NX Gold S.A. ("NX Gold") which owns the Xavantina Operations, an operating gold mine located in Mato Grosso State, Brazil. In July 2024, the Company signed a definitive earn-in agreement with Vale Base Metals for the right to acquire a 60% interest in the Furnas Copper-Gold Project, located in the Carajás Mineral Province in Pará State, Brazil. For more information on the earn-in agreement, please see the Company's press releases dated October 30, 2023 and July 22, 2024. Additional information on the Company and its operations, including technical reports on the Caraíba Operations, Xavantina Operations, Tucumã Operation and the Furnas Copper-Gold Project, can be found on the Company's website (www.erocopper.com), on SEDAR+ (http://www.sedarplus.ca/landingpage/) and on EDGAR (www.sec.gov). The Company's shares are publicly traded on the Toronto Stock Exchange and the New York Stock Exchange under the symbol "ERO".

    FOR MORE INFORMATION, PLEASE CONTACT

    Farooq Hamed, VP, Investor Relations

    [email protected]

    CAUTION REGARDING FORWARD LOOKING INFORMATION AND STATEMENTS

    This press release contains "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" within the meaning of applicable Canadian securities legislation (collectively, "forward-looking statements"). Forward-looking statements include statements that use forward-looking terminology such as "may", "could", "would", "will", "should", "intend", "target", "plan", "expect", "budget", "estimate", "forecast", "schedule", "anticipate", "believe", "continue", "potential", "view" or the negative or grammatical variation thereof or other variations thereof or comparable terminology. Forward-looking statements may include, but are not limited to, statements with respect to the future drilling continuing to demonstrate continuity of high grade mineralization at depth, Ero's ability to complete the required 17,000 meter Phase 2 drill program and deliver a preliminary economic assessment during the first half of 2026, the 45,000 meter Phase 3 drill program and engineering studies, and any other statement that may predict, forecast, indicate or imply future plans, intentions, levels of activity, results, performance or achievements.

    Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual results, actions, events, conditions, performance or achievements to materially differ from those expressed or implied by the forward-looking statements, including, without limitation, risks discussed in this press release and in the Company's most recent Annual Information Form ("AIF") under the heading "Risk Factors". The risks discussed in this press release and in the AIF are not exhaustive of the factors that may affect any of the Company's forward-looking statements. Although the Company has attempted to identify important factors that could cause actual results, actions, events, conditions, performance or achievements to differ materially from those contained in forward-looking statements, there may be other factors that cause results, actions, events, conditions, performance or achievements to differ from those anticipated, estimated or intended.

    Forward-looking statements are not a guarantee of future performance. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements involve statements about the future and are inherently uncertain, and the Company's actual results, achievements or other future events or conditions may differ materially from those reflected in the forward-looking statements due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to herein and in the AIF under the heading "Risk Factors".

    The Company's forward-looking statements are based on the assumptions, beliefs, expectations and opinions of management on the date the statements are made, many of which may be difficult to predict and beyond the Company's control. In connection with the forward-looking statements contained in this press release and in the AIF, the Company has made certain assumptions about, among other things: favourable equity and debt capital markets; the ability to raise any necessary additional capital on reasonable terms to advance the production, development and exploration of the Company's properties and assets; future prices of copper, gold and other metal prices; the timing and results of exploration and drilling programs; the accuracy of any mineral reserve and mineral resource estimates; the geology of the Caraíba Operations, the Xavantina Operations, the Tucumã Operation and the Furnas Copper-Gold Project being as described in the respective technical report for each property; production costs; the accuracy of budgeted exploration, development and construction costs and expenditures; the price of other commodities such as fuel; future currency exchange rates, interest rates and tariff rates; operating conditions being favourable such that the Company is able to operate in a safe, efficient and effective manner; work force continuing to remain healthy in the face of prevailing epidemics, pandemics or other health risks, political and regulatory stability; the receipt of governmental, regulatory and third party approvals, licenses and permits on favourable terms; obtaining required renewals for existing approvals, licenses and permits on favourable terms; requirements under applicable laws; sustained labour stability; stability in financial and capital goods markets; availability of equipment; positive relations with local groups and the Company's ability to meet its obligations under its agreements with such groups; and satisfying the terms and conditions of the Company's current loan arrangements. Although the Company believes that the assumptions inherent in forward-looking statements are reasonable as of the date of this press release, these assumptions are subject to significant business, social, economic, political, regulatory, competitive and other risks and uncertainties, contingencies and other factors that could cause actual actions, events, conditions, results, performance or achievements to be materially different from those projected in the forward-looking statements. The Company cautions that the foregoing list of assumptions is not exhaustive. Other events or circumstances could cause actual results to differ materially from those estimated or projected and expressed in, or implied by, the forward-looking statements contained in this press release. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

    Forward-looking statements contained herein are made as of the date of this press release and the Company disclaims any obligation to update or revise any forward-looking statement, whether as a result of new information, future events or results or otherwise, except as and to the extent required by applicable securities laws.

    CAUTIONARY NOTES REGARDING MINERAL RESOURCE AND MINERAL RESERVE ESTIMATES

    Unless otherwise indicated, all resource estimates included in this press release and the documents incorporated by reference herein have been prepared in accordance with National Instrument 43-101, Standards of Disclosure for Mineral Projects and the CIM Definition Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council, as amended (the "CIM Standards"). NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. Canadian standards, including NI 43-101, differ significantly from the requirements of the United States Securities and Exchange Commission (the "SEC"), and resource information included herein may not be comparable to similar information disclosed by U.S. companies.

    Figures accompanying this announcement are available at: 

    https://www.globenewswire.com/NewsRoom/AttachmentNg/330b0a43-cc0a-4f6b-b938-59c81a4d453a

    https://www.globenewswire.com/NewsRoom/AttachmentNg/0adc4cb5-1fef-462e-8e82-9ca51f8ca411

    https://www.globenewswire.com/NewsRoom/AttachmentNg/b8e92df5-a40b-4221-a12a-47800aad9bfa



    Primary Logo

    Get the next $ERO alert in real time by email

    Crush Q3 2025 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $ERO

    DatePrice TargetRatingAnalyst
    7/9/2025Buy
    Stifel
    7/9/2025Outperform → Sector Perform
    National Bank Financial
    4/16/2025Outperform
    BMO Capital Markets
    4/4/2025Hold
    Desjardins
    2/12/2025Hold → Buy
    TD Cowen
    12/2/2024Buy
    Goldman
    9/3/2024Mkt Perform → Outperform
    Raymond James
    9/3/2024$28.00Buy
    BofA Securities
    More analyst ratings

    $ERO
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    Global Copper Demand Projected to Outpace Supply by Over 500,000 Tonnes In 2025, Driving Upward Price Pressure

    MarketNewsUpdates News Commentary NEW YORK, Sept. 23, 2025 /PRNewswire/ -- Copper—long hailed as "the metal with a PhD in economics"—has become central to industry, agriculture, infrastructure, and global development. As we look to 2025, the copper price outlook 2025 supply demand forecast takes on increasing importance. This metal underpins advances in smart farming, electrification, renewable energy, and sophisticated infrastructure projects in both emerging and developed markets. A report from Farmonaut said that: "According to multiple industry observers and market analytics, the copper price forecast October 2025 projects a trading range of $9,000 to $10,500 per metric tonne." The repor

    9/23/25 9:10:00 AM ET
    $ERO
    $FCX
    $HBM
    Metal Mining
    Basic Materials

    Ero Copper Intercepts 115 Meters at 0.98% CuEq¹ in Deepest Hole Drilled to Date at Furnas Copper-Gold Project – Phase 2 Drill Program to be Completed in Early Q4 2025

    VANCOUVER, British Columbia, Sept. 18, 2025 (GLOBE NEWSWIRE) -- Ero Copper Corp. (TSX:ERO, NYSE:ERO) ("Ero" or the "Company") is pleased to announce the remaining assay results from its 28,000-meter Phase 1 drill program at the Furnas Copper-Gold Project ("Furnas" or the "Project"), located in the Carajás Mineral Province in Pará State, Brazil. Complete results from the Phase 1 program are highlighted by intercepts that continue to demonstrate high-grade continuity throughout the deposit as well as significantly extend the known limits of mineralization within the high-grade zones (greater than 1% CuEq1) to depth. To date, mineralization has been extended to a depth of approximately 950 m

    9/18/25 7:00:00 AM ET
    $ERO
    Metal Mining
    Basic Materials

    Ero Copper Reports Second Quarter 2025 Operating and Financial Results

    VANCOUVER, British Columbia, July 31, 2025 (GLOBE NEWSWIRE) -- Ero Copper Corp. (TSX:ERO, NYSE:ERO) ("Ero" or the "Company") is pleased to announce its operating and financial results for the three and six months ended June 30, 2025. Management will host a conference call tomorrow, Friday, August 1, 2025, at 11:30 a.m. Eastern time to discuss the results. Dial-in details for the call can be found near the end of this press release. HIGHLIGHTS Consolidated second quarter copper production was a record 15,513 tonnes, reflecting the continued ramp-up of the Tucumã Operation as well as higher grades and mining rates at the Caraíba Operation

    7/31/25 5:41:18 PM ET
    $ERO
    Metal Mining
    Basic Materials

    $ERO
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    View All

    Stifel initiated coverage on Ero Copper

    Stifel initiated coverage of Ero Copper with a rating of Buy

    7/9/25 8:28:13 AM ET
    $ERO
    Metal Mining
    Basic Materials

    Ero Copper downgraded by National Bank Financial

    National Bank Financial downgraded Ero Copper from Outperform to Sector Perform

    7/9/25 8:28:13 AM ET
    $ERO
    Metal Mining
    Basic Materials

    BMO Capital Markets resumed coverage on Ero Copper

    BMO Capital Markets resumed coverage of Ero Copper with a rating of Outperform

    4/16/25 8:09:26 AM ET
    $ERO
    Metal Mining
    Basic Materials

    $ERO
    SEC Filings

    View All

    SEC Form 6-K filed by Ero Copper Corp.

    6-K - Ero Copper Corp. (0001853860) (Filer)

    9/18/25 7:15:04 AM ET
    $ERO
    Metal Mining
    Basic Materials

    SEC Form F-X filed by Ero Copper Corp.

    F-X - Ero Copper Corp. (0001853860) (Subject)

    8/29/25 7:08:48 PM ET
    $ERO
    Metal Mining
    Basic Materials

    SEC Form F-10 filed by Ero Copper Corp.

    F-10 - Ero Copper Corp. (0001853860) (Filer)

    8/29/25 6:49:55 PM ET
    $ERO
    Metal Mining
    Basic Materials

    $ERO
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    SEC Form SC 13G filed by Ero Copper Corp.

    SC 13G - Ero Copper Corp. (0001853860) (Subject)

    11/14/24 4:47:37 PM ET
    $ERO
    Metal Mining
    Basic Materials

    Amendment: SEC Form SC 13G/A filed by Ero Copper Corp.

    SC 13G/A - Ero Copper Corp. (0001853860) (Subject)

    11/14/24 1:34:53 PM ET
    $ERO
    Metal Mining
    Basic Materials

    Amendment: SEC Form SC 13G/A filed by Ero Copper Corp.

    SC 13G/A - Ero Copper Corp. (0001853860) (Subject)

    11/12/24 9:55:15 AM ET
    $ERO
    Metal Mining
    Basic Materials

    $ERO
    Financials

    Live finance-specific insights

    View All

    Ero Copper Reports Second Quarter 2025 Operating and Financial Results

    VANCOUVER, British Columbia, July 31, 2025 (GLOBE NEWSWIRE) -- Ero Copper Corp. (TSX:ERO, NYSE:ERO) ("Ero" or the "Company") is pleased to announce its operating and financial results for the three and six months ended June 30, 2025. Management will host a conference call tomorrow, Friday, August 1, 2025, at 11:30 a.m. Eastern time to discuss the results. Dial-in details for the call can be found near the end of this press release. HIGHLIGHTS Consolidated second quarter copper production was a record 15,513 tonnes, reflecting the continued ramp-up of the Tucumã Operation as well as higher grades and mining rates at the Caraíba Operation

    7/31/25 5:41:18 PM ET
    $ERO
    Metal Mining
    Basic Materials

    Ero Copper to Release Second Quarter 2025 Operating and Financial Results on July 31, 2025

    VANCOUVER, British Columbia, June 24, 2025 (GLOBE NEWSWIRE) -- Ero Copper Corp. (TSX:ERO, NYSE:ERO) (the "Company") will publish its second quarter 2025 operating and financial results on Thursday, July 31, 2025, after market close. The Company will host a conference call to discuss the results on Friday, August 1, 2025 at 11:30am Eastern time (8:30am Pacific time). A results presentation will be available for download via the webcast link and in the Presentations section of the Company's website on the day of the conference call. CONFERENCE CALL DETAILS Date:Friday, August 1, 2025Time: 11:30am Eastern Time (8:30am Pacific Time)Dial In:Canada/USA Toll Free: 1-833-752-3380, Internationa

    6/24/25 5:05:00 PM ET
    $ERO
    Metal Mining
    Basic Materials

    Ero Copper Reports First Quarter 2025 Operating and Financial Results

    (all amounts in US dollars, unless otherwise noted) VANCOUVER, British Columbia, May 05, 2025 (GLOBE NEWSWIRE) -- Ero Copper Corp. (TSX:ERO, NYSE:ERO) ("Ero" or the "Company") is pleased to announce its operating and financial results for the three months ended March 31, 2025. Management will host a conference call tomorrow, Tuesday, May 6, 2025, at 11:30 a.m. Eastern time to discuss the results. Dial-in details for the call can be found near the end of this press release. HIGHLIGHTS Consolidated first quarter copper production was 12,424 tonnes, reflecting the continued commissioning and ramp-up of the Tucumã Operation. The Tucumã Operation produced 5,067 tonnes of copper in concentrat

    5/5/25 5:07:11 PM ET
    $ERO
    Metal Mining
    Basic Materials

    $ERO
    Leadership Updates

    Live Leadership Updates

    View All

    Ero Copper Announces Voting Results of Annual General Meeting of Shareholders

    VANCOUVER, British Columbia , April 24, 2025 (GLOBE NEWSWIRE) -- Ero Copper Corp. (TSX:ERO, NYSE:ERO) ("Ero" or the "Company") reported the voting results from its Annual General Meeting of Shareholders held today in Vancouver, British Columbia. A total of 88,486,748 common shares were represented at the meeting, being 85.44% of the issued and outstanding common shares of the Company as at the March 5, 2025 record date. Shareholders voted in favour of all items of business before the meeting, including the re-election of management's nominees as directors for the ensuing year and the advisory vote on executive compensation. Detailed results of the votes are presented below. Each item of b

    4/24/25 8:27:01 PM ET
    $ERO
    Metal Mining
    Basic Materials

    Ero Copper Announces Voting Results of Annual General Meeting of Shareholders

    VANCOUVER, British Columbia, April 24, 2024 (GLOBE NEWSWIRE) -- Ero Copper Corp. (TSX:ERO, NYSE:ERO) ("Ero" or the "Company") reported the voting results from its Annual General Meeting of Shareholders held today in Vancouver, British Columbia. A total of 93,474,205 common shares were represented at the meeting, being 90.96% of the issued and outstanding common shares of the Company as at the March 5, 2024 record date. Shareholders voted in favour of all items of business before the meeting, including the re-election of management's nominees as directors for the ensuing year and the advisory vote on executive compensation. Detailed results of the votes are presented below. Each item of bu

    4/24/24 9:00:58 PM ET
    $ERO
    Metal Mining
    Basic Materials

    Ero Copper Announces Changes to the Board of Directors

    VANCOUVER, British Columbia, Nov. 01, 2023 (GLOBE NEWSWIRE) -- Ero Copper Corp. (TSX:ERO, NYSE:ERO) ("Ero" or the "Company") is pleased to announce the appointment of Faheem Tejani to the Company's Board of Directors (the "Board"), effective today, as part of the Company's ongoing Board succession planning. The Company also announces that Director Matthew Wubs will not be seeking re-election at the 2024 Annual Meeting of Shareholders (the "2024 Annual Meeting"), as he plans to dedicate more time to his family business. "On behalf of the Board, I would like to extend our appreciation to Matt for his invaluable contributions and dedication since joining us in 2016," said Christopher Noel Du

    11/1/23 5:45:00 PM ET
    $ERO
    Metal Mining
    Basic Materials