• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • AI SuperconnectorNEW
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • AI SuperconnectorNEW
  • Settings
  • RSS Feeds
PublishGo to AppAI Superconnector
    Quantisnow Logo

    © 2025 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEW
    Legal
    Terms of usePrivacy policyCookie policy

    Lumwana Expansion In Full Swing As Barrick Builds Tier One Copper Mine

    7/10/25 12:00:00 PM ET
    $B
    Precious Metals
    Basic Materials
    Get the next $B alert in real time by email

    All amounts expressed in US dollars

    LUSAKA, Zambia, July 10, 2025 (GLOBE NEWSWIRE) -- Construction of the $2 billion Super Pit Expansion Project at Barrick Mining Corporation's (NYSE:B)(TSX:ABX) Lumwana mine is well underway, accelerating its transformation into a Tier One copper mine.

    Addressing members of the media and other stakeholders here today, Barrick president and chief executive Mark Bristow said the Lumwana expansion builds on a remarkable turnaround that has seen the operation evolve from a struggling asset into a key pillar of both Barrick's global copper portfolio and Zambia's long-term development agenda.

    "When we reviewed the Lumwana mine in 2019, it was high-cost and underperforming. Today, it's a growing force in African copper. With this expansion gaining momentum, Lumwana is on course to join the world's list of large and strategically important copper mines, and a powerful driver of growth for both Zambia and Barrick," Bristow said.

    The expansion will double copper production to 240,000 tonnes a year, supported by a 50 million tonne per annum processing plant. Site construction is underway, long-lead equipment orders have been placed, and infrastructure upgrades — including a new power transmission framework developed in partnership with ZESCO — are progressing to support both the mine and the wider region.

    Since 2019, the mine has contributed over $4 billion to the Zambian economy through taxes, royalties, procurement and wages. More than $3.4 billion has been spent with Zambian suppliers, representing 79% of its total procurement. In Q1 of this year alone, $177 million or 81% of procurement was placed with local contractors. Today, 98% of Lumwana's workforce are Zambian nationals, with nearly half drawn from nearby communities.

    As part of an integrated development plan aligned with Zambia's Mining and Minerals 2031 policy, the Lumwana expansion will drive the development of the Manyama township and industrial supplier park. A new regional airstrip is expected to be completed by the end of the year and a TEVETA-accredited training centre will be launched to expand Zambia's mining skills base.

    The mine is also advancing one of the country's most ambitious environmental and carbon initiatives, with the development of a REDD+ forest conservation programme in collaboration with local chiefdoms and the Forestry Department. Covering up to 300,000 hectares, the project is designed to generate future carbon credits while supporting sustainable livelihoods, biodiversity and land stewardship.

    "Lumwana is becoming a flagship for sustainable copper mining. It demonstrates how a world-class mine can help build an industrial ecosystem while protecting the environment and expanding economic opportunity," said Bristow.

    Operationally, Lumwana is tracking well against its 2025 production guidance. Performance in the first quarter set a strong tone for the year, supported by increased plant throughput and continued improvements in open-pit efficiency. The mine retained ISO 14001 and 45001 certifications and recorded no Class 1 or Class 2 environmental incidents to date.

    "We're not just expanding a mine, we're strengthening a partnership. Our teams are actively exploring further growth opportunities across the Zambian copperbelt, building on our recently signed Memorandum of Understanding with the Government of Zambia. Together, we're laying the foundation for lasting economic and social development that will endure long after mining ends," Bristow said.

    Barrick Enquiries

    Group investor and media relations

    Kathy du Plessis

    +44 20 7557 7738

    [email protected]

    Zambia Country Manager

    Anthony Malenga

    +260 977 730 513

    Website: www.barrick.com

    Cautionary Statement on Forward-Looking Information

    Certain information contained or incorporated by reference in this press release, including any information as to our strategy, projects, plans or future financial or operating performance, constitutes "forward-looking statements". All statements, other than statements of historical fact, are forward-looking statements. The words "expect", "strategy", "estimates", "target", "plan", "guidance", "project", "additional", "growth", "potential", "future", "focus", "will", and similar expressions identify forward-looking statements. In particular, this press release contains forward-looking statements including, without limitation, with respect to: Barrick's forward-looking production guidance; Barrick's Lumwana Super Pit expansion project and its ability to extend Lumwana's life of mine; global projected copper production and demand profiles; estimated copper production from the Lumwana Super Pit expansion, including projected mining rates; the financial performance of the Lumwana Super Pit expansion; the estimated capital budget for the Lumwana Super Pit expansion; anticipated timelines for delivery of the feasibility study, project construction, first production, and key execution timeframes for the Lumwana Super Pit expansion; our ability to convert resources into reserves and replace reserves net of depletion from production; estimates of future costs, mine life and production rates; Barrick's strategy, plans, targets and goals in respect of environmental and social governance issues, including local community development and, climate change initiatives, health and safety and biodiversity initiatives; electrical grid upgrades and stability; and expectations regarding future price assumptions, financial performance and other outlook or guidance.

    Forward-looking statements are necessarily based upon a number of estimates and assumptions including material estimates and assumptions related to the factors set forth below that, while considered reasonable by the Company as at the date of this press release in light of management's experience and perception of current conditions and expected developments, are inherently subject to significant business, economic and competitive uncertainties and contingencies. Known and unknown factors could cause actual results to differ materially from those projected in the forward-looking statements and undue reliance should not be placed on such statements and information. Such factors include, but are not limited to: fluctuations in the spot and forward price of gold, copper or certain other commodities (such as silver, diesel fuel, natural gas and electricity); risks associated with projects in the early stages of evaluation and for which additional engineering and other analysis is required; risks related to the possibility that future exploration results will not be consistent with the Company's expectations, that quantities or grades of reserves will be diminished, and that resources may not be converted to reserves; risks associated with the fact that certain of the initiatives described in this press release are still in the early stages and may not materialize; changes in mineral production performance, exploitation and exploration successes; risks that exploration data may be incomplete and considerable additional work may be required to complete further evaluation, including but not limited to drilling, engineering and socioeconomic studies and investment; the speculative nature of mineral exploration and development; lack of certainty with respect to foreign legal systems, corruption and other factors that are inconsistent with the rule of law; disruption of supply routes which may cause delays in construction and mining activities, including disruptions in the supply of key mining inputs due to the invasion of Ukraine by Russia and conflicts in the Middle East; risk of loss due to acts of war, terrorism, sabotage and civil disturbances; risks associated with artisanal and illegal mining; changes in national and local government legislation, taxation, controls or regulations and/or changes in the administration of laws, policies and practices; expropriation or nationalization of property and political or economic developments in Zambia or other countries in which Barrick does or may carry on business in the future; risks relating to political instability in certain of the jurisdictions in which Barrick operates; timing of receipt of, or failure to comply with, necessary permits and approvals; non-renewal of or failure to obtain key licenses by governmental authorities; failure to comply with environmental and health and safety laws and regulations; increased costs and physical and transition risks related to climate change, including extreme weather events, resource shortages, emerging policies and increased regulations relating to greenhouse gas emission levels, energy efficiency and reporting of risks; Barrick's ability to achieve its sustainability goals, including its climate-related goals and greenhouse gas emissions reduction targets; contests over title to properties, particularly title to undeveloped properties, or over access to water, power and other required infrastructure; the liability associated with risks and hazards in the mining industry, and the ability to maintain insurance to cover such losses; damage to the Company's reputation due to the actual or perceived occurrence of any number of events, including negative publicity with respect to the Company's handling of environmental matters or dealings with community groups, whether true or not; risks related to operations near communities that may regard Barrick's operations as being detrimental to them; litigation and legal and administrative proceedings; operating or technical difficulties in connection with mining or development activities, including geotechnical challenges, tailings dam and storage facilities failures, and disruptions in the maintenance or provision of required infrastructure and information technology systems; increased costs, delays, suspensions and technical challenges associated with the construction of capital projects; risks associated with working with partners in jointly controlled assets; risks related to disruption of supply routes which may cause delays in construction and mining activities; risks associated with Barrick's infrastructure, information technology systems and the implementation of Barrick's technological initiatives, including risks related to cybersecurity incidents, including those caused by computer viruses, malware, ransomware and other cyberattacks, or similar information technology system failures, delays and/or disruptions; the potential to convert all or part of the mineral resource for the Super Pit expansion into a mineral reserve following the completion of the feasibility study; risks related to competition in the mining industry; employee relations including loss of key employees; availability and increased costs associated with mining inputs and labor; and risks associated with diseases, epidemics and pandemics. In addition, there are risks and hazards associated with the business of mineral exploration, development and mining, including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins, flooding and gold bullion, copper cathode or gold or copper concentrate losses (and the risk of inadequate insurance, or inability to obtain insurance, to cover these risks).

    Many of these uncertainties and contingencies can affect our actual results and could cause actual results to differ materially from those expressed or implied in any forward-looking statements made by, or on behalf of, us. Readers are cautioned that forward-looking statements are not guarantees of future performance. All of the forward-looking statements made in this press release are qualified by these cautionary statements. Specific reference is made to the most recent Form 40-F/Annual Information Form on file with the SEC and Canadian provincial securities regulatory authorities for a more detailed discussion of some of the factors underlying forward-looking statements and the risks that may affect Barrick's ability to achieve the expectations set forth in the forward-looking statements contained in this press release.

    Barrick disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by applicable law.



    Primary Logo

    Get the next $B alert in real time by email

    Crush Q3 2025 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $B

    DatePrice TargetRatingAnalyst
    4/18/2024$35.00 → $45.00Neutral → Buy
    DA Davidson
    10/11/2022Peer Perform
    Wolfe Research
    4/11/2022$42.00Overweight → Neutral
    Alembic Global Advisors
    More analyst ratings

    $B
    Insider Trading

    Insider transactions reveal critical sentiment about the company from key stakeholders. See them live in this feed.

    View All

    Director Katz Adam J disposed of 641,163 shares and returned $91,940,098 worth of shares to the company (1,935,581 units at $47.50), closing all direct ownership in the company (SEC Form 4)

    4 - BARNES GROUP INC (0000009984) (Issuer)

    1/29/25 8:52:13 PM ET
    $B
    Precious Metals
    Basic Materials

    President and CEO Hook Thomas J disposed of 187,500 shares and returned $21,850,522 worth of shares to the company (460,011 units at $47.50), closing all direct ownership in the company (SEC Form 4)

    4 - BARNES GROUP INC (0000009984) (Issuer)

    1/27/25 1:07:10 PM ET
    $B
    Precious Metals
    Basic Materials

    Director Manner Hans-Peter returned $22,388,317 worth of shares to the company (471,333 units at $47.50), closing all direct ownership in the company (SEC Form 4)

    4 - BARNES GROUP INC (0000009984) (Issuer)

    1/27/25 1:08:39 PM ET
    $B
    Precious Metals
    Basic Materials

    $B
    Insider Purchases

    Insider purchases reveal critical bullish sentiment about the company from key stakeholders. See them live in this feed.

    View All

    Mangum Mylle H bought $1,912 worth of shares (67 units at $28.65), increasing direct ownership by 0.25% to 26,367 units (SEC Form 4)

    4 - BARNES GROUP INC (0000009984) (Issuer)

    12/12/23 3:48:02 PM ET
    $B
    Precious Metals
    Basic Materials

    Manner Hans-Peter bought $1,138,815 worth of shares (50,000 units at $22.78), increasing direct ownership by 311% to 66,079 units (SEC Form 4)

    4 - BARNES GROUP INC (0000009984) (Issuer)

    11/9/23 3:12:45 PM ET
    $B
    Precious Metals
    Basic Materials

    Acker Marian bought $45,023 worth of shares (2,000 units at $22.51), increasing direct ownership by 7% to 32,599 units (SEC Form 4)

    4 - BARNES GROUP INC (0000009984) (Issuer)

    11/7/23 4:37:48 PM ET
    $B
    Precious Metals
    Basic Materials

    $B
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    View All

    Barnes Group upgraded by DA Davidson with a new price target

    DA Davidson upgraded Barnes Group from Neutral to Buy and set a new price target of $45.00 from $35.00 previously

    4/18/24 7:26:23 AM ET
    $B
    Precious Metals
    Basic Materials

    Wolfe Research initiated coverage on Barnes Group

    Wolfe Research initiated coverage of Barnes Group with a rating of Peer Perform

    10/11/22 7:16:00 AM ET
    $B
    Precious Metals
    Basic Materials

    Barnes Group downgraded by Alembic Global Advisors with a new price target

    Alembic Global Advisors downgraded Barnes Group from Overweight to Neutral and set a new price target of $42.00

    4/11/22 8:41:22 AM ET
    $B
    Precious Metals
    Basic Materials

    $B
    SEC Filings

    View All

    SEC Form 6-K filed by Barrick Mining Corporation

    6-K - BARRICK MINING CORP (0000756894) (Filer)

    8/11/25 5:20:38 PM ET
    $B
    Precious Metals
    Basic Materials

    SEC Form 15-12G filed by Barnes Group Inc.

    15-12G - BARNES GROUP INC (0000009984) (Filer)

    2/6/25 9:14:41 AM ET
    $B
    Precious Metals
    Basic Materials

    SEC Form S-8 POS filed by Barnes Group Inc.

    S-8 POS - BARNES GROUP INC (0000009984) (Filer)

    1/27/25 10:53:23 AM ET
    $B
    Precious Metals
    Basic Materials

    $B
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    Ben van Beurden Appointed Lead Director of Barrick, Succeeding Stalwart Brett Harvey in the Position

    TORONTO, Aug. 11, 2025 (GLOBE NEWSWIRE) -- Barrick Mining Corporation (NYSE:B)(TSX:ABX) today announced that Ben van Beurden has been appointed Lead Independent Director of the Board, succeeding Brett Harvey. Mr van Beurden, former CEO of Shell, joined Barrick's Board in May 2025 and brings nearly four decades of global leadership in the energy and natural resources sectors. At Shell, he led the company's strategic transformation from an oil-focused business to a diversified energy leader, with significant investments in natural gas and renewables. He also streamlined Shell's structure, consolidated its headquarters in London and positioned the company among the leaders in the energy tran

    8/11/25 6:05:00 AM ET
    $B
    Precious Metals
    Basic Materials

    Barrick Builds Momentum in Q2 With Higher Production, Stronger Cash Flows and Key Growth Projects on Track

    LONDON, Aug. 11, 2025 (GLOBE NEWSWIRE) -- Barrick Mining Corporation (NYSE:B)(TSX:ABX) ("Barrick" or the "Company") delivered a strong performance in the second quarter, increasing gold and copper production, growing free cash flow1 and advancing its pipeline of Tier One2 projects — all while returning more capital to shareholders. The performance builds on the first quarter's positive start to the year and positions the Company for an even stronger second half. Net earnings per share rose to $0.47 for the quarter, with adjusted net earnings per share1 also at $0.47. Operating cash flow for the first half of the year was $2.5 billion, 32% higher than the prior-year period, while free cash

    8/11/25 6:00:48 AM ET
    $B
    Precious Metals
    Basic Materials

    Barrick Reports Share Repurchases and Declares Enhanced Q2 Dividend

    All amounts expressed in US dollars TORONTO, Aug. 11, 2025 (GLOBE NEWSWIRE) -- Barrick Mining Corporation (NYSE:B)(TSX:ABX) ("Barrick" or the "Company") today announced the declaration of an enhanced dividend of $0.15 per share for the second quarter of 2025. The dividend is consistent with the Company's Performance Dividend Policy announced at the start of 2022.   The Q2 2025 dividend will be paid on September 15, 2025 to shareholders of record at the close of business on August 29, 2025. In addition to the enhanced quarterly dividend, Barrick repurchased 13.50 million shares during Q2 under the share buyback program that was announced in February 2025. As of the end of Q2, Barri

    8/11/25 5:59:00 AM ET
    $B
    Precious Metals
    Basic Materials

    $B
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    SEC Form SC 13D/A filed by Barnes Group Inc. (Amendment)

    SC 13D/A - BARNES GROUP INC (0000009984) (Subject)

    3/7/24 9:15:35 AM ET
    $B
    Precious Metals
    Basic Materials

    SEC Form SC 13G/A filed by Barnes Group Inc. (Amendment)

    SC 13G/A - BARNES GROUP INC (0000009984) (Subject)

    2/14/24 6:06:48 AM ET
    $B
    Precious Metals
    Basic Materials

    SEC Form SC 13G/A filed by Barnes Group Inc. (Amendment)

    SC 13G/A - BARNES GROUP INC (0000009984) (Subject)

    2/13/24 5:00:45 PM ET
    $B
    Precious Metals
    Basic Materials

    $B
    Leadership Updates

    Live Leadership Updates

    View All

    Lumwana Expansion In Full Swing As Barrick Builds Tier One Copper Mine

    All amounts expressed in US dollars LUSAKA, Zambia, July 10, 2025 (GLOBE NEWSWIRE) -- Construction of the $2 billion Super Pit Expansion Project at Barrick Mining Corporation's (NYSE:B)(TSX:ABX) Lumwana mine is well underway, accelerating its transformation into a Tier One copper mine. Addressing members of the media and other stakeholders here today, Barrick president and chief executive Mark Bristow said the Lumwana expansion builds on a remarkable turnaround that has seen the operation evolve from a struggling asset into a key pillar of both Barrick's global copper portfolio and Zambia's long-term development agenda. "When we reviewed the Lumwana mine in 2019, it was high-cost and un

    7/10/25 12:00:00 PM ET
    $B
    Precious Metals
    Basic Materials

    Guidewire Software Set to Join S&P MidCap 400; Arrowhead Pharmaceuticals to Join S&P SmallCap 600

    NEW YORK, Jan. 22, 2025 /PRNewswire/ -- Guidewire Software Inc. (NYSE:GWRE) will replace Arrowhead Pharmaceuticals Inc. (NASD: ARWR) in the S&P MidCap 400, and Arrowhead Pharmaceuticals will replace Barnes Group Inc. (NYSE:B) in the S&P SmallCap 600 effective prior to the opening of trading on Monday, January 27. S&P 500 constituent Apollo Global Management Inc. (NYSE:APO) is acquiring Barnes Group in a deal expected to be completed soon pending final conditions. Following is a summary of the changes that will take place prior to the open of trading on the effective date: Effective Date Index Name       Action Company Name Ticker GICS Sector January 27, 2025 S&P MidCap 400 Addition Guidewi

    1/22/25 5:54:00 PM ET
    $APO
    $ARWR
    $B
    Investment Managers
    Finance
    Biotechnology: Pharmaceutical Preparations
    Health Care

    Barnes Announces Update to Board of Directors

    Announces Planned Retirements of Chairman Thomas O. Barnes and Lead Independent Director Mylle H. Mangum, and appointment of Richard Hipple as Chair Elect Appoints Irenic Capital Management Co-Founder Adam Katz to the Board Enters into Cooperation Agreement with Irenic Capital Management Barnes Group Inc. (NYSE:B), a global provider of highly engineered products, differentiated industrial technologies, and innovative solutions, today announced the planned retirements of Chairman Thomas O. Barnes and Lead Independent Director Mylle H. Mangum, consistent with the Company's corporate governance retirement policy, effective at the Company's Annual Meeting of Stockholders in May 2024. Mr.

    3/5/24 4:15:00 PM ET
    $B
    $LMT
    $SPR
    Precious Metals
    Basic Materials
    Military/Government/Technical
    Industrials

    $B
    Financials

    Live finance-specific insights

    View All

    Barrick Reports Share Repurchases and Declares Enhanced Q2 Dividend

    All amounts expressed in US dollars TORONTO, Aug. 11, 2025 (GLOBE NEWSWIRE) -- Barrick Mining Corporation (NYSE:B)(TSX:ABX) ("Barrick" or the "Company") today announced the declaration of an enhanced dividend of $0.15 per share for the second quarter of 2025. The dividend is consistent with the Company's Performance Dividend Policy announced at the start of 2022.   The Q2 2025 dividend will be paid on September 15, 2025 to shareholders of record at the close of business on August 29, 2025. In addition to the enhanced quarterly dividend, Barrick repurchased 13.50 million shares during Q2 under the share buyback program that was announced in February 2025. As of the end of Q2, Barri

    8/11/25 5:59:00 AM ET
    $B
    Precious Metals
    Basic Materials

    Barrick to Report Second Quarter 2025 Results on August 11, 2025

    TORONTO, July 17, 2025 (GLOBE NEWSWIRE) -- Barrick Mining Corporation (NYSE:B)(TSX:ABX) will release its second quarter 2025 results before markets open on Monday, August 11, 2025 at approximately 6:00 AM EDT. President and CEO Mark Bristow will host a webcast to discuss the results at 11:00 AM EDT followed by a question-and-answer session with analysts. Q2 2025 RESULTSQ2 Results releaseAugust 11, 06:00 EDT / 10:00 UTCLive presentation and webcastAugust 11, 11:00 EDT / 15:00 UTCRegister to attend the webcast The presentation materials will be available on Barrick's website at www.barrick.com and the webinar will remain online for later viewing. About Barrick Mining Corporation Barrick is

    7/17/25 7:00:00 AM ET
    $B
    Precious Metals
    Basic Materials

    Next Gold Powerhouse Emerges as Prices Break Records

    NetworkNewsWire Editorial Coverage NEW YORK, June 4, 2025 /PRNewswire/ -- As gold surges to record highs above $3,000+ per ounce in May 2025 — outpacing the S&P 500, NASDAQ and even bitcoin—Wall Street's focus is shifting. With U.S. debt-to-GDP now exceeding 120% and real interest rates still historically negative, gold has reaffirmed its role as the market's most reliable hedge. But for institutional investors, bullion and ETFs aren't enough anymore. What they want now is leverage, scalability and cash flow. That's why the spotlight is turning toward a new class of near-term gold producers: companies with clean balance sheets, high internal rates of return (IRR) and operational models desig

    6/4/25 8:30:00 AM ET
    $AEM
    $B
    $BHP
    Precious Metals
    Basic Materials
    Coal Mining
    Energy