• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    Vertiv Introduces New Modular Liquid Cooling Infrastructure Solution to Support High-Density Compute Requirements in North America and EMEA

    1/14/26 8:00:00 AM ET
    $VRT
    Industrial Machinery/Components
    Technology
    Get the next $VRT alert in real time by email

    The scalable, hybrid cooling solution, Vertiv™ MegaMod™ HDX, delivers capacity up to 10 MW and accommodates rack densities from 50 kW to more than 100 kW per rack.

    COLUMBUS, Ohio, Jan. 14, 2026 /PRNewswire/ -- Vertiv (NYSE:VRT), a global leader in critical digital infrastructure, today announced new configurations of the Vertiv™ MegaMod™ HDX, a prefabricated power and liquid cooling infrastructure solution engineered for high-density computing environments, including artificial intelligence (AI) and high-performance computing (HPC) deployments. The new configurations give operators flexibility to support rapidly increasing power and cooling requirements while optimizing space and deployment speed. The models are available globally.

    The versatile, prefabricated Vertiv™ MegaMod™ HDX power and thermal infrastructure integrates direct-to-chip liquid cooling with air cooling to support AI and high-density requirements. © Vertiv

    Vertiv MegaMod HDX integrates direct-to-chip liquid cooling with air-cooled architectures to meet the intense thermal demands of AI workloads, supporting pod-style AI environments and advanced GPU clusters. The new compact solution has a standard module height and a maximum of 13 racks and power capacity up to 1.25 MW; the combo solution has an extended-height design with a maximum of 144 racks, supporting power capacities up to 10 MW. Both can support rack densities from 50 kW up to more than 100 kW per rack. The hybrid cooling architectures integrate direct-to-chip liquid cooling with air cooling for efficient, high-density thermal management, while the prefabricated modular designs enable accelerated deployment and allow customers to scale their data centers as demand grows.

    "Today's AI workloads demand cooling solutions that go beyond traditional approaches. With the Vertiv MegaMod HDX available in both compact and combo solution configurations, organizations can match their facility requirements while supporting high-density, liquid-cooled environments at scale. Our designs deliver what data centers need most—reliable performance, operational efficiency, and the ability to scale their AI infrastructure with confidence," said Viktor Petik, senior vice president, infrastructure solutions at Vertiv.

    The Vertiv MegaMod HDX models feature innovative hybrid cooling architecture, combining direct-to-chip liquid cooling with adaptable air systems in a fully integrated, prefabricated pod. The solutions feature distributed redundant power architecture enabling continuous operation even if one module goes offline. Additionally, the buffer-tank thermal backup system allows GPU clusters to maintain stable operations during maintenance or load transitions. This factory-integrated design enables repeatable precision in deployment while providing cost certainty for planning and scaling AI infrastructure.

    This prefabricated design, combined with factory integrated and fully tested components and Vertiv's global service network, provide dependable end-to-end support.

    Vertiv's extensive portfolio of power, thermal, and IT management solutions supports a wide range of data center architectures, enabling customers to meet rising density demands with scalable, high-performance infrastructure. Both configurations draw on this broader portfolio, including the Vertiv™ Liebert® APM2 uninterruptible power supply (UPS), Vertiv™ CoolChip CDU cooling distribution unit, Vertiv™ PowerBar busway system, and Vertiv™ Unify infrastructure monitoring.

    Vertiv also offers IT rack infrastructure designed to seamlessly accommodate and support IT systems, including Vertiv™ racks and Vertiv™ OCP- compliant racks, Vertiv™ CoolLoop RDHx rear door heat exchanger, Vertiv™ CoolChip in-rack CDU, Vertiv™ rack power distribution units, Vertiv™ PowerDirect in-rack DC power system, and Vertiv™ CoolChip Fluid Network Rack Manifolds.

    For more information about the Vertiv MegaMod HDX, visit Vertiv.com.

    About Vertiv

    Vertiv (NYSE:VRT) brings together hardware, software, analytics and ongoing services to enable its customers' vital applications to run continuously, perform optimally and grow with their business needs. Vertiv solves the most important challenges facing today's data centers, communication networks and commercial and industrial facilities with a portfolio of power, cooling and IT infrastructure solutions and services that extends from the cloud to the edge of the network. Headquartered in Westerville, Ohio, USA, Vertiv does business in more than 130 countries. For more information, and for the latest news and content from Vertiv, visit Vertiv.com.

    Forward-looking statements

    This release contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, Section 27 of the Securities Act, and Section 21E of the Securities Exchange Act. These statements are only a prediction. Actual events or results may differ materially from those in the forward-looking statements set forth herein. Readers are referred to Vertiv's filings with the Securities and Exchange Commission, including its most recent Annual Report on Form 10-K and any subsequent Quarterly Reports on Form 10-Q for a discussion of these and other important risk factors concerning Vertiv and its operations. Vertiv is under no obligation to, and expressly disclaims any obligation to, update or alter its forward-looking statements, whether as a result of new information, future events or otherwise.

    VERTIV MEDIA CONTACT

    [email protected]

     

    Vertiv logo (PRNewsfoto/Vertiv Corporation)

    Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/vertiv-introduces-new-modular-liquid-cooling-infrastructure-solution-to-support-high-density-compute-requirements-in-north-america-and-emea-302661073.html

    SOURCE Vertiv Holdings Co

    Get the next $VRT alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $VRT

    DatePrice TargetRatingAnalyst
    1/2/2026$200.00Equal Weight → Overweight
    Barclays
    12/9/2025Outperform → Peer Perform
    Wolfe Research
    8/20/2025$135.00Neutral
    Rothschild & Co Redburn
    7/28/2025Outperform
    William Blair
    7/8/2025$165.00Hold → Buy
    Melius
    4/8/2025$75.00Buy
    ROTH MKM
    3/7/2025$121.00Outperform
    RBC Capital Mkts
    1/28/2025$125.00Buy → Hold
    Melius
    More analyst ratings

    $VRT
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    Vertiv Introduces New Modular Liquid Cooling Infrastructure Solution to Support High-Density Compute Requirements in North America and EMEA

    The scalable, hybrid cooling solution, Vertiv™ MegaMod™ HDX, delivers capacity up to 10 MW and accommodates rack densities from 50 kW to more than 100 kW per rack. COLUMBUS, Ohio, Jan. 14, 2026 /PRNewswire/ -- Vertiv (NYSE:VRT), a global leader in critical digital infrastructure, today announced new configurations of the Vertiv™ MegaMod™ HDX, a prefabricated power and liquid cooling infrastructure solution engineered for high-density computing environments, including artificial intelligence (AI) and high-performance computing (HPC) deployments. The new configurations give operators flexibility to support rapidly increasing power and cooling requirements while optimizing space and deployment

    1/14/26 8:00:00 AM ET
    $VRT
    Industrial Machinery/Components
    Technology

    Vertiv Expects Powering Up for AI, Digital Twins and Adaptive Liquid Cooling to Shape Data Center Design and Operations

    Forces including extreme densification, gigawatt scaling, and data center as unit of compute are driving these trends COLUMBUS, Ohio, Jan. 8, 2026 /PRNewswire/ -- Data center innovation is continuing to be shaped by macro forces and technology trends related to AI, according to a report from Vertiv (NYSE:VRT), a global leader in critical digital infrastructure. The Vertiv™ Frontiers report, which draws on expertise from across the organization, details the technology trends driving current and future innovation, from powering up for AI, to digital twins, to adaptive liquid cooling.

    1/8/26 7:00:00 AM ET
    $VRT
    Industrial Machinery/Components
    Technology

    Hut 8 Signs 15-Year, 245 MW AI Data Center Lease at River Bend Campus with Total Contract Value of $7.0 Billion

    15-year 245 MW IT lease valued at $7.0 billion over the base term and up to $17.7 billion if all renewal options are exercised Google providing a financial backstop covering obligations for the 15-year base lease term Hut 8 to implement an institutional-grade execution model designed to de-risk project delivery with blue-chip counterparties—Entergy (NYSE:ETR), J.P. Morgan (NYSE:JPM), Goldman Sachs (NYSE:GS), Vertiv (NYSE:VRT), and Jacobs (NYSE:J) MIAMI, Dec. 17, 2025 /PRNewswire/ -- Hut 8 Corp. (NASDAQ:HUT) (TSX:HUT) ("Hut 8" or the "Company"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive use cases

    12/17/25 6:15:00 AM ET
    $ETR
    $GS
    $HUT
    Electric Utilities: Central
    Utilities
    Investment Bankers/Brokers/Service
    Finance

    $VRT
    SEC Filings

    View All

    Vertiv Holdings LLC filed SEC Form 8-K: Completion of Acquisition or Disposition of Assets, Regulation FD Disclosure, Financial Statements and Exhibits

    8-K - Vertiv Holdings Co (0001674101) (Filer)

    12/5/25 6:29:52 AM ET
    $VRT
    Industrial Machinery/Components
    Technology

    Vertiv Holdings LLC filed SEC Form 8-K: Regulation FD Disclosure, Financial Statements and Exhibits

    8-K - Vertiv Holdings Co (0001674101) (Filer)

    11/14/25 6:32:50 AM ET
    $VRT
    Industrial Machinery/Components
    Technology

    Vertiv Holdings LLC filed SEC Form 8-K: Regulation FD Disclosure

    8-K - Vertiv Holdings Co (0001674101) (Filer)

    11/3/25 6:46:48 AM ET
    $VRT
    Industrial Machinery/Components
    Technology

    $VRT
    Insider Trading

    Insider transactions reveal critical sentiment about the company from key stakeholders. See them live in this feed.

    View All

    Chief Legal Counsel & Sec. Gill Stephanie L covered exercise/tax liability with 4,890 shares, decreasing direct ownership by 18% to 22,580 units (SEC Form 4)

    4 - Vertiv Holdings Co (0001674101) (Issuer)

    1/6/26 4:34:24 PM ET
    $VRT
    Industrial Machinery/Components
    Technology

    Chief Product and Tech Officer Armul Scott was granted 11,388 shares, increasing direct ownership by 69% to 27,794 units (SEC Form 4)

    4 - Vertiv Holdings Co (0001674101) (Issuer)

    1/5/26 6:12:00 PM ET
    $VRT
    Industrial Machinery/Components
    Technology

    Director Fradin Roger gifted 36,626 shares and received a gift of 36,626 shares, closing all direct ownership in the company (SEC Form 4)

    4 - Vertiv Holdings Co (0001674101) (Issuer)

    12/22/25 8:00:21 PM ET
    $VRT
    Industrial Machinery/Components
    Technology

    $VRT
    Analyst Ratings

    Analyst ratings in real time. Analyst ratings have a very high impact on the underlying stock. See them live in this feed.

    View All

    Vertiv upgraded by Barclays with a new price target

    Barclays upgraded Vertiv from Equal Weight to Overweight and set a new price target of $200.00

    1/2/26 7:19:46 AM ET
    $VRT
    Industrial Machinery/Components
    Technology

    Vertiv downgraded by Wolfe Research

    Wolfe Research downgraded Vertiv from Outperform to Peer Perform

    12/9/25 8:40:02 AM ET
    $VRT
    Industrial Machinery/Components
    Technology

    Rothschild & Co Redburn initiated coverage on Vertiv with a new price target

    Rothschild & Co Redburn initiated coverage of Vertiv with a rating of Neutral and set a new price target of $135.00

    8/20/25 9:03:10 AM ET
    $VRT
    Industrial Machinery/Components
    Technology

    $VRT
    Leadership Updates

    Live Leadership Updates

    View All

    Vertiv Announces Leadership Transition in EMEA Region

    Paul Ryan named as president, Europe, Middle East and Africa as of January 1, 2026 COLUMBUS, Ohio, Oct. 13, 2025 /PRNewswire/ -- Vertiv (NYSE:VRT), a global leader in critical digital infrastructure, today announced that Karsten Winther will retire from his position as president, Europe, Middle East and Africa (EMEA), effective December 31, 2025. Paul Ryan, currently chief procurement officer, has been appointed as his successor, starting January 1, 2026. "Karsten has made impactful contributions to Vertiv during his tenure, particularly in strengthening our EMEA region throug

    10/13/25 10:45:00 AM ET
    $VRT
    Industrial Machinery/Components
    Technology

    Vertiv Names Craig Chamberlin as Chief Financial Officer

    COLUMBUS, Ohio, Oct. 13, 2025 /PRNewswire/ -- Vertiv Holdings Co (NYSE:VRT), a global leader in critical digital infrastructure, today announced the appointment of Craig Chamberlin as Executive Vice President and Chief Financial Officer, effective November 10, 2025. Mr. Chamberlin succeeds David Fallon, who previously announced his intention to retire from Vertiv and serve as a consultant to the company through December 31, 2026. Mr. Chamberlin joins Vertiv from Wabtec Corporation, where he most recently served as Group Vice President and Chief Financial Officer of the company

    10/13/25 6:45:00 AM ET
    $VRT
    Industrial Machinery/Components
    Technology

    Vertiv Appoints Wei Shen as President of Greater China

    COLUMBUS, Ohio, July 21, 2025 /PRNewswire/ -- Vertiv (NYSE:VRT), a global leader in critical digital infrastructure, today announced the appointment of Wei Shen as president of Greater China, effective July 22, 2025. Shen joins Vertiv from Gates Corporation, where he served as vice president, general manager – Greater China for nine years. Prior to Gates Corporation, he held several leadership positions at Eaton Electrical, including vice president, general manager of distributed power quality for APAC, vice president of sales operations and power quality marketing APAC, and b

    7/21/25 10:45:00 AM ET
    $VRT
    Industrial Machinery/Components
    Technology

    $VRT
    Large Ownership Changes

    This live feed shows all institutional transactions in real time.

    View All

    SEC Form SC 13G filed by Vertiv Holdings LLC

    SC 13G - Vertiv Holdings Co (0001674101) (Subject)

    11/13/24 4:34:55 PM ET
    $VRT
    Industrial Machinery/Components
    Technology

    Amendment: SEC Form SC 13G/A filed by Vertiv Holdings LLC

    SC 13G/A - Vertiv Holdings Co (0001674101) (Subject)

    11/12/24 5:49:48 PM ET
    $VRT
    Industrial Machinery/Components
    Technology

    Amendment: SEC Form SC 13G/A filed by Vertiv Holdings LLC

    SC 13G/A - Vertiv Holdings Co (0001674101) (Subject)

    11/12/24 10:34:17 AM ET
    $VRT
    Industrial Machinery/Components
    Technology

    $VRT
    Financials

    Live finance-specific insights

    View All

    Hut 8 Signs 15-Year, 245 MW AI Data Center Lease at River Bend Campus with Total Contract Value of $7.0 Billion

    15-year 245 MW IT lease valued at $7.0 billion over the base term and up to $17.7 billion if all renewal options are exercised Google providing a financial backstop covering obligations for the 15-year base lease term Hut 8 to implement an institutional-grade execution model designed to de-risk project delivery with blue-chip counterparties—Entergy (NYSE:ETR), J.P. Morgan (NYSE:JPM), Goldman Sachs (NYSE:GS), Vertiv (NYSE:VRT), and Jacobs (NYSE:J) MIAMI, Dec. 17, 2025 /PRNewswire/ -- Hut 8 Corp. (NASDAQ:HUT) (TSX:HUT) ("Hut 8" or the "Company"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive use cases

    12/17/25 6:15:00 AM ET
    $ETR
    $GS
    $HUT
    Electric Utilities: Central
    Utilities
    Investment Bankers/Brokers/Service
    Finance

    Vertiv Declares Quarterly Dividend

    COLUMBUS, Ohio, Nov. 14, 2025 /PRNewswire/ -- Vertiv Holdings Co (NYSE:VRT), a global leader in critical digital infrastructure, today announced that its Board of Directors has raised its regular annual cash dividend by 67% from $0.15 to $0.25 per share, to be declared and paid quarterly, reflecting the company's strong financial performance and cash flow. The increase will be effective starting with the fourth-quarter cash dividend of $0.0625 per share of Class A common stock, which was declared by the Board of Directors November 13, 2025, and is payable on December 18, 2025, to shareholders of record of Class A common stock at the close of business on November 25, 2025.

    11/14/25 6:30:00 AM ET
    $VRT
    Industrial Machinery/Components
    Technology

    Vertiv Reports Strong Third Quarter Results including Organic Orders +60%, Diluted EPS +122% (Adjusted EPS +63%); Raises 2025 Guidance

    Third quarter organic orders up ~60% compared to prior year period and up 20% sequentially from second quarter 2025. Strong third quarter trailing twelve-month (TTM) organic orders up 21% compared to prior year TTM period.Diluted EPS of $1.02 and adjusted diluted EPS(1) of $1.24, up 63% from third quarter 2024Third quarter net sales up 29% and organic net sales(1) up 28% compared to prior year third quarterOperating profit of $517 million, up 39% from third quarter 2024, and adjusted operating profit(1) of $596 million, up 43% from third quarter 2024Adjusted operating margin of 22.3%, up 220 basis points compared to third quarter 2024 and up 380 basis points sequentially from second quarter

    10/22/25 5:55:00 AM ET
    $VRT
    Industrial Machinery/Components
    Technology