• Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
Quantisnow Logo
  • Live Feeds
    • Press Releases
    • Insider Trading
    • FDA Approvals
    • Analyst Ratings
    • Insider Trading
    • SEC filings
    • Market insights
  • Analyst Ratings
  • Alerts
  • Subscriptions
  • Settings
  • RSS Feeds
PublishGo to App
    Quantisnow Logo

    © 2026 quantisnow.com
    Democratizing insights since 2022

    Services
    Live news feedsRSS FeedsAlertsPublish with Us
    Company
    AboutQuantisnow PlusContactJobsAI superconnector for talent & startupsNEWLLM Arena
    Legal
    Terms of usePrivacy policyCookie policy

    Nova's RPM Valley Drilling Confirms Continuity of Mineralized System with High-Grade Intercepts and Remains Wide Open in Multiple Directions

    1/13/26 6:30:00 AM ET
    $NVA
    Precious Metals
    Basic Materials
    Get the next $NVA alert in real time by email

    Anchorage Alaska, Jan. 13, 2026 (GLOBE NEWSWIRE) -- Nova Minerals Limited ("Nova" or the "Company") (NASDAQ:NVA) (ASX: NVA) (FRA: QM3) ) is pleased to announce further drill results from the RPM Valley deposit with the 2025 closely spaced infill results returning multiple broad intercepts >1 g/t Au, and visible gold observed in an Estelle Project record intercept of 0.5 m @ 364 g/t Au, within the Company's flagship Estelle Gold and Critical Minerals Project, located in the prolific Tintina Gold Belt in Alaska.

    Highlights

    • Drill results include the highest-grade intercept drilled at RPM - and over the greater Estelle Project - to date of 0.5m @ 364 g/t Au from 101m, with visible gold observed in the drill core (Table 1, and Figures 2 to 4).
    • Broad gold intersections continue at RPM Valley with the 2025 closely spaced infill results expected to support a maiden Measured and Indicated Mineral Resource at the valley deposit, in support of the Pre-Feasibility Study (PFS). Mineralization remains wide open with numerous holes extending below the current pit shells. Significant results include (Table 1, and Figures 2 to 7):
      • RPM-081                                                                         
        • 65m @ 3.6 g/t Au from 83m including;
        • 36m @ 5.5 g/t Au from 91m                           
        • 0.5m @ 364.0 g/t Au at 101m
      • RPM-069                                                                         
        • 155m @ 0.9 g/t Au from 71m including;        
        •  94m @ 1.3 g/t Au from 126m
        •  18m @ 2.8 g/t Au from 196m
      • RPM-072
        • 172m @ 0.8 g/t Au from 352m including;
        •  60m @ 1.2 g/t Au from 424m and
        •  26m @ 1.4 g/t Au from 495m
        • Also 101m @ 0.5 g/t Au from 6m at RPM North
      • RPM-075                                                                         
        • 152m @ 0.9 g/t Au from 82m including;
        •  25m @ 1.9 g/t Au from 174
      • RPM-082                                                                         
        • 289m @ 0.7 g/t Au from 62m including;
        •  40m @ 1.2 g/t Au from 152m, and                
        •  82m @ 1.0 g/t Au from 266m
      • RPM-084                                                                         
        • 101m @ 0.8 g/t Au from 225m including;
        •  53m @ 1.2 g/t Au from 273m, and                
      • RPMRC-009                                                                   
        • 33m @ 0.3 g/t Au from surface in the glacial till

    • The new results follow-up and now confirm continuity of mineralization at RPM Valley, where previous drilling included (ASX Announcements: 4 October and 21 December 2022, and 10 January 2024):
      • RPM-063: 9m @ 3.1 g/t Au from 83 and 70m @ 1.1 g/t Au from 205m
      • RPM-060: 54m @ 2.1 g/t Au from 260m, including 17m @ 5.3 g/t Au from 273m
      • RPM-048: 54m @ 1.2 g/t Au from 244m, including 16m @ 2.4 g/t Au from 255m
      • RPM-037: 268m @ 0.7 g/t from 282m including 103m @ 1.0 g/t Au, including 30m @ 1.9 g/t Au, 21m @ 2.5 g/t Au from 325m, and 79m @ 1.0 g/t Au from 471m, including 30m @ 2.0 g/t Au from 501m
      • RPM-025: 76m @ 1.2 g/t Au from 440m, including 43m @ 1.5 g/t Au from 474m, and 30m @ 1.7 g/t Au from 486m
    • 10 RC holes were completed in the RPM glacial till using Nova's in-house rig as a preliminary, cost-effective test, returning a notable intercept of 33 m @ 0.3 g/t Au from surface (RPMRC-009). Results indicate the essentially drilled and blasted till material may be at least 30m thick over ~330,000 m², and this area remains a high-priority target, with future work to focus on improved sampling methods and thickness verification (Table 3 and Figure 8).
    • To view a commentary video from Nova's CEO, Christopher Gerteisen, discussing the significance of these latest drill results, please click here.
    • All results from RPM have now been reported. Further drill results will be released once received and validated under Nova's QA/QC procedures, after which an updated Mineral Resource Estimate (MRE) will incorporate results from the 2023–2025 drill programs.
    • PFS-level studies are ongoing, with METS Engineering undertaking additional metallurgical test work to build on the high gold recoveries achieved at RPM to date (ASX Announcement: 5 August 2025), Rough Stock Mining is conducting mining studies, and Whittle Consulting is completing optimization studies.
    • Results from the extensive soil and rock chip surface samples taken from across the project area in 2025 will also be reported once received and processed.

    Nova CEO, Mr Christopher Gerteisen, commented:



    "These results represent a significant advancement for RPM Valley and further validate the scale and quality of the gold system identified to date. The high-grade intercept of 0.5 m @ 364 g/t Au confirms the presence of discrete high-grade zones within a broader, mineralised system, which remains wide open in multiple directions and at depth.

    "The consistency of mineralization over long intervals and across hundreds of metres reinforces our view that RPM Valley has the continuity and scale required to underpin a potentially significant mining operation, with additional upside to be assessed through further drilling. With all assays now received from the 2025 RPM infill and step-out drilling program, we expect these results to positively inform the next mineral resource update.

    "While the maiden glacial till RC drilling was impacted by low sample recovery due to the unconsolidated nature of the material, the results indicate the glacial till mineralized zone is at least 30m thick. Combined with a previously identified > 1 g/t Au surface anomaly of approximately 1.7km long and 200m wide, this area remains a priority target. The till material is already crushed up, free dig material, which could be very amendable to heap leach recovery. Nova plans follow-up work with improved sampling methods.

    "As pre-feasibility level studies progress across metallurgy, mining and optimisation, the Company remains focused on advancing RPM toward development while continuing to grow the resource base. With a number of near-term milestones ahead and a strong pipeline of exploration targets across the broader project area, RPM Valley continues to demonstrate its potential as a key growth asset for Nova."

    2025 RPM Valley Drilling Summary

    A total of 10 holes were drilled at RPM Valley in 2025, designed to:

    • Conduct infill drilling at the RPM Valley deposit to increase the confidence of the resource.
    • Continue to expand the RPM resource in the valley to the west by targeting the hornfels/intrusive contact.
    • Test the connection between RPM North and RPM Valley.

    The latest diamond core drill results continue to increase resource confidence at the RPM Valley deposit. All holes encountered mineralization at the base of the ice, which averaged 60m to 70m down hole. The holes drilled from Pads 23-14 and 25-2 all encountered granodiorite at the base of ice, except for RPM-071, which was drilled to the east and encountered hornfels bedrock at approximately 65m. Drilling in the valley has been relatively sparse compared to RPM North, and this season's efforts aimed to increase resource confidence and delineate what is shaping up to be a much larger mineralized intrusive unit. Drilling access is difficult here due to the nature of moraines, and difficulties were encountered coring through ice on the shallower dipping holes. Figure 1 below shows the drill setup on pad 25-2.

    Figure 1. RPM Valley Pad 25-2

    While the high-grade zones intersected at RPM Valley thus far may not be as broad as those at RPM North, the mineralized intrusive is larger, and the boundary remains open to the south, southeast, and at depth. Mineralization occurs within sheeted quartz and quartz-tourmaline veins. Arsenopyrite remains the dominant gold bearing sulfide, but some holes exhibited very-fine visible gold, as well as molybdenite, pyrite, and the telluride altaite. The highest grade intercept drilled at RPM - and over the greater Estelle Project - to date is shown below in Figure 2, where 0.5m @ 364 g/t Au was encountered.

    Figure 2. RPM Valley hole RPM-081 0.5m @ 364.0 g/t Au at 101m, with visible gold observed in the assayed core

    Holes RPM-071 and RPM-072 were designed to test the connection between RPM North and RPM Valley. RPM-071 was collared on the glacial moraine. It was set at a 040 degree azimuth and a -60 degree dip and missed the valley intrusion, but intersected the bottom of the RPM North granodiorite. While RPM-071 didn't report any significant intercepts, a broad, albeit low-grade, intercept of 154m @ 0.2 g/t Au from 304m using a 0.1 g/t cut-off was reported. RPM-072 was collared on the ridge at RPM North and angled back towards RPM Valley at a 220 degree azimuth and -50 degree dip. Two notable zones of mineralization were encountered, including 101m @ 0.5 g/t Au from 6m in the RPM North granodiorite and 172m @ 0.8 g/t Au from 352m in the RPM Valley granodiorite. The hornfels sedimentary rock separating these two intrusive bodies does not contain any notable mineralization. Hole RPM-084, shown on the same section (See Figure 6), was designed to test the southwestern extent of the intrusive; however, due to drilling complications and impending freezing conditions, the hole was abandoned at 327m before reaching the southern contact with the hornfels. Hole RPM-084 (Figure 6) intercepted 101m @ 0.8 g/t Au from 225m to the final depth of 327m, this included 53m @ 1.6 g/t Au from 273m, meaning the hole had improved mineralization at depth. This mineralized zone remains open to the south and at depth. RPM-082 ran parallel to RPM-084 from the northern pad 25-3 (Figure 3), and due to drilling complications, was terminated at 354m. This hole intercepted 289m @ 0.7 g/t Au, with mineralization remaining open to the southwest and at depth.

    Holes RPM-069, -073, -075, -077, -081, and -082 (Figures 3, 4, 5, and 7) were designed to test the northern and northeastern contacts of the granodiorite with the hornfels – testing the hypothesis that the contact zone could be similar geologically to the high-grade core of RPM North which also occurs at the northern contact of the granodiorite and the hornfels. The northern contact at RPM Valley does not appear to confine the mineralization has tightly as that found at RPM North, however, some significant broad zones of mineralization were encountered with three of the holes having over 100m at ≥0.7 g/t Au, and of course the high-grade zone discussed in hole RPM-081 with 0.5m @ 364 g/t Au.

    Figure 3: RPM plan view with all drill holes to date – Black drill traces represent the 2025 drill holes

    Figure 4. RPM Valley RPM-081 (92 azi)

    Figure 5: RPM Valley Section RPM-069 and RPM-073 (127.5 azi)

    Figure 6. RPM Valley and North RPM-0-71, RPM-072, and RPM-084 (32 azi)

    Figure 7: RPM Valley RPM-082 (15 azi)

    Table :1 Significant intercepts

    Hole_IDFrom (m)To (m)Interval (m)Au g/t
    RPM-069712261550.9
    Including126220941.3
     196214182.8
    RPM-072352525

    1720.8
    Including424484601.2
     495521261.4
    And*61071010.5
    Including*4670241.0
    RPM-07388175860.5
    RPM-075822351520.9
    Including129155271.3
     171231601.0
     174199251.9
    RPM-08183148653.6
    Including91128365.5
     100.8101.30.5364.0
    RPM-082623512890.7
    Including152192401.2
     266348821.0
     266300341.7
    RPM-0842253271010.8
    Including80159790.5
     273327531.2



    Table 2:
    Drill hole details

    Hole_IDEastingNorthingElev



    (m)
    EOH



    (m)
    AziDipZoneAssay Results
    RPM-06950186468486461681321310-70RPM ValleyASX: 13/01/25
    RPM-0715018656848647168046640-60Valley/NorthASX: 13/01/25
    RPM-07250199268488041769568220-50Valley/NorthASX: 13/01/25
    RPM-07350186568486461680280320-70RPM ValleyASX: 13/01/25
    RPM-07550186668486441680308290-70RPM ValleyASX: 13/01/25
    RPM-07750185268486871675191260-50RPM ValleyASX: 13/01/25
    RPM-07950182568487461654185180-60RPM ValleyASX: 13/01/25
    RPM-08150185368486861675275270-70RPM ValleyASX: 13/01/25
    RPM-08250182468487461654354195-60RPM ValleyASX: 13/01/25
    RPM-08350185468486851676160195-50RPM ValleyASX: 13/01/25
    RPM-08450185468486871675327200-60RPM ValleyASX: 13/01/25



    RPM Till Reverse Circulation Drilling Summary

    A total of ten holes were drilled in the glacial till with Nova's in-house reverse circulation (RC) drill rig. The RC drilling method in the loose unconsolidated mineralized glacial till resulted in sample loss and low recoveries, and the inability to consistently reach target depth due to difficult ground conditions. As such, the Company believes that these samples underrepresent the potential grade and depth of the zone. Alternative drilling methods such as split spoon sampling or sonic drilling may be more appropriate tools to retrieve more representative, in-situ samples from the till. However, Nova's utilization of their RC drill rig was cost effective for this preliminary test. The finer fraction targeted in the 2024 soil sampling grid (ASX Announcement 3 February 2025) is susceptible to being blown out by the compressed air and into the unconsolidated till and not recovered in the drill sample. Despite this drawback, one significant intercept was returned from RPMRC-009 with 33m @ 0.3 g/t Au from surface. It is important to note that the glacial till is essentially like a drilled and blasted broken rock stockpile, and likely amenable to heap leaching which has been proven effective at RPM (Gold recoveries of up to 68.7% achieved via heap leach in ASX Announcement 5 August 2025). Maiden drilling confirms the till is at least 33m thick in a debris lobe that has been mapped to have an areal extent of over 1.7km long and 200m wide (~ 330,000 square meters) shown as Qdt2 on Figure 8. The glacial till remains a high priority target for Nova, and future work will focus on collecting more representative samples and verifying the overall thickness.

    Figure 8. RPM glacial till RC drilling plan view

    Figure 9: RPM glacial till RPMRC-009 and RPMRC-010 (090 azi)

    Table 3. Glacial Till Intercepts

    Hole_IDFrom (m)To (m)Interval (m)Au g/t
    RPMRC_001013130.2
    RPMRC_002515110.3
    RPMRC_00391020.2
    RPMRC_00481130.1
    RPMRC_0050880.2
    RPMRC_0060990.3
    RPMRC_0070330.2
    RPMRC_0080660.2
    RPMRC_009033330.3
    RPMRC_0100770.4

    Table 4. RC Hole Details

    Hole_IDEastingNorthingElev



    (m)
    EOH



    (m)
    AziDip ZoneAssay Results
    RPMRC_00150051168500521338560-90Glacial TillASX: 13/01/25
    RPMRC_00250051468500541338240-90Glacial TillASX: 13/01/25
    RPMRC_00350046568500791329180-90Glacial TillASX: 13/01/25
    RPMRC_00450046868500751330180-90Glacial TillASX: 13/01/25
    RPMRC_00550047668500921330150-90Glacial TillASX: 13/01/25
    RPMRC_00650047568500941330130-90Glacial TillASX: 13/01/25
    RPMRC_00750049968500671335160-90Glacial TillASX: 13/01/25
    RPMRC_00850049968500661335160-90Glacial TillASX: 13/01/25
    RPMRC_00950086968498991432380-90Glacial TillASX: 13/01/25
    RPMRC_0105008716849900143290-90Glacial TillASX: 13/01/25



    Upcoming Milestones

    • Further drill results
    • Further results and potential new discoveries from the 2025 surface exploration mapping and sampling program
    • Material PFS test-work results as they become available
    • Updated MRE
    • Winter trail mobilization of heavy equipment
    • Airborne geophysical surveys to commence in the spring of 2026
    • Antimony phase 1 project updates
    • Metallurgical test work ongoing
    • Environmental test work ongoing
    • West Susitna access road updates

    Qualified Persons

    Vannu Khounphakdee, Professional Geologist and member of Australian Institute of Geoscientists contracted by Nova Minerals to provide geologic consulting services. Mr. Khounphakdee holds a Master of Science in Mine Geology and Engineering. He is a qualified person with at least 5 years experience with this type of project. By reason of education, affiliation with a professional association, and past relevant work experience, Mr. Khounphakdee fulfills the requirements of Qualified Person (QP) for the purposes of SEC Regulation SK-1300 for data QA/QC checks relevant to this announcement.

    Hans Hoffman is a State of Alaska Certified Professional Geologist contracted by Nova Minerals to provide geologic consulting services. Mr. Hoffman is a member of the American Institute of Professional Geologists and holds a Bachelor of Science degree in Geological Engineering with a double major in Geology and Geophysics. He is a qualified person with at least 5 years of experience with these types of projects. By reason of education, affiliation with a professional association, and past relevant work experience, Mr. Hoffman fulfills the requirements of Qualified Person (QP) for the purposes of SEC Regulation SK-1300 for the technical information presented in this announcement.

    Christopher Gerteisen, Chief Executive Officer of Nova Minerals, is a Professional Geologist and member of Australian Institute of Geoscientists, and has supervised the preparation of this news release and has reviewed and approved the scientific and technical information contained herein. Mr. Gerteisen is a "qualified person" for the purposes of SEC Regulation S-K 1300.

    Data Verification

    For the 2025 diamond core drilling program, core samples were cut in half and crushed to achieve >90% passing a 2mm sieve and split down to 225 g to 275 g samples at Nova's on-site prep facility. Samples were then sent to ALS Fairbanks for additional prep and chemical analysis. Duplicates were collected every 1 in 20 samples at the same time using the same method (riffle split) as the parent sample. Blank material was inserted 1 in 40 samples. Standard Reference Material (SRM) was inserted 1 in 20 samples. Three different SRMs at three different grades levels were used.

    ALS is a certified commercial laboratory and is independent of Nova Minerals. Samples are tested for gold using ALS Fire Assay Au-ICP21 technique. This technique has a lower detection limit of 0.001 g/t with an upper detection limit of 10 g/t. If samples have grades in excess of 10 g/t then Au-GRA21 is used to determine the over detect limit. Au-GRA21 has a detection limit of 0.05 g/t and an upper limit of 10,000 g/t. Four acid digestion with ICP-MS finish (ME-MS61) was used to evaluate 48 different elements.

    About Nova Minerals Limited

    Nova Minerals Limited is a Gold, Antimony and Critical Minerals exploration and development company focused on advancing the Estelle Project, comprised of 514 km2 of State of Alaska mining claims, which contains multiple mining complexes across a 35 km long mineralized corridor of over 20 advanced Gold and Antimony prospects, including two already defined multi-million ounce resources, and several drill ready Antimony prospects with massive outcropping stibnite vein systems observed at surface. The 85% owned project is located 150 km northwest of Anchorage, Alaska, USA, in the prolific Tintina Gold Belt, a province which hosts a >220 million ounce (Moz) documented gold endowment and some of the world's largest gold mines and discoveries including, Kinross Gold Corporation's Fort Knox Gold Mine. The belt also hosts significant Antimony deposits and was a historical North American Antimony producer.

    Further discussion and analysis of the Estelle Project is available through the interactive Vrify 3D animations, presentations, and videos, all available on the Company's website. www.novaminerals.com.au

    Forward Looking Statements

    This press release contains "forward-looking statements" that are subject to substantial risks and uncertainties. All statements, other than statements of historical fact, contained in this press release are forward-looking statements. Forward-looking statements contained in this press release may be identified by the use of words such as "anticipate," "believe," "contemplate," "could," "estimate," "expect," "intend," "seek," "may," "might," "plan," "potential," "predict," "project," "target," "aim," "should," "will" "would," or the negative of these words or other similar expressions, although not all forward-looking statements contain these words. Forward-looking statements are based on Nova Minerals Limited's current expectations and are subject to inherent uncertainties, risks and assumptions that are difficult to predict. Further, certain forward-looking statements are based on assumptions as to future events that may not prove to be accurate. These and other risks and uncertainties are described more fully in the section titled "Risk Factors" in the final prospectus related to the public offering filed with the Securities and Exchange Commission. Forward-looking statements contained in this announcement are made as of this date, and Nova Minerals Limited undertakes no duty to update such information except as required under applicable law.

    For Additional Information Please Contact

    Investor Relations:

    Dave Gentry, CEO

    RedChip Companies, Inc.

    Phone: 1-407-644-4256

    Email: [email protected]

    Nova Minerals:

    Craig Bentley

    Director of Finance & Compliance & Investor Relations

    E: [email protected]

    M: +61 414 714 196





    Primary Logo

    Get the next $NVA alert in real time by email

    Crush Q1 2026 with the Best AI Superconnector

    Stay ahead of the competition with Standout.work - your AI-powered talent-to-startup matching platform.

    AI-Powered Inbox
    Context-aware email replies
    Strategic Decision Support
    Get Started with Standout.work

    Recent Analyst Ratings for
    $NVA

    DatePrice TargetRatingAnalyst
    More analyst ratings

    $NVA
    SEC Filings

    View All

    SEC Form 6-K filed by Nova Minerals Limited

    6-K - Nova Minerals Ltd (0001852551) (Filer)

    1/16/26 6:45:17 AM ET
    $NVA
    Precious Metals
    Basic Materials

    SEC Form 6-K filed by Nova Minerals Limited

    6-K - Nova Minerals Ltd (0001852551) (Filer)

    1/13/26 6:45:32 AM ET
    $NVA
    Precious Metals
    Basic Materials

    SEC Form 6-K filed by Nova Minerals Limited

    6-K - Nova Minerals Ltd (0001852551) (Filer)

    1/7/26 6:45:07 AM ET
    $NVA
    Precious Metals
    Basic Materials

    $NVA
    Press Releases

    Fastest customizable press release news feed in the world

    View All

    Nova's RPM Valley Drilling Confirms Continuity of Mineralized System with High-Grade Intercepts and Remains Wide Open in Multiple Directions

    Anchorage Alaska, Jan. 13, 2026 (GLOBE NEWSWIRE) -- Nova Minerals Limited ("Nova" or the "Company") (NASDAQ:NVA) (ASX: NVA) (FRA: QM3) ) is pleased to announce further drill results from the RPM Valley deposit with the 2025 closely spaced infill results returning multiple broad intercepts >1 g/t Au, and visible gold observed in an Estelle Project record intercept of 0.5 m @ 364 g/t Au, within the Company's flagship Estelle Gold and Critical Minerals Project, located in the prolific Tintina Gold Belt in Alaska. Highlights Drill results include the highest-grade intercept drilled at RPM - and over the greater Estelle Project - to date of 0.5m @ 364 g/t Au from 101m, with visible gold obser

    1/13/26 6:30:00 AM ET
    $NVA
    Precious Metals
    Basic Materials

    Nova's RPM North Drilling Confirms Further Resource Upside with East Extension Discovery

    Anchorage Alaska, Jan. 07, 2026 (GLOBE NEWSWIRE) -- Nova Minerals Limited ("Nova" or the "Company") (NASDAQ:NVA) (ASX: NVA) (FRA: QM3) ) is pleased to announce further broad, near-surface gold results from its RPM North deposit, within the Company's flagship Estelle Gold and Critical Minerals Project, located in the prolific Tintina Gold Belt in Alaska. Highlights 2025 drilling extends the halo around the high-grade core zone at RPM North with further broad intercepts and a new eastern discovery. RPM Valley results from the high-grade zone expected shortly.Broad near-surface gold intersections continue at RPM North, with the 2025 drill program confirming the eastern strike extension and

    1/7/26 6:30:00 AM ET
    $NVA
    Precious Metals
    Basic Materials

    Response to Media Article Regarding Pakistani Antimony Concentrate

    Melbourne, Australia, Jan. 05, 2026 (GLOBE NEWSWIRE) -- Nova Minerals Limited ("Nova" or the "Company") (NASDAQ:NVA) (ASX: NVA) (FRA: QM3) ) a gold and critical minerals exploration stage company focused on advancing the Estelle Gold and Critical Minerals Project in Alaska, U.S.A., has become aware of media articles speculating on the Company's arrangements regarding the potential acquisition of antimony in Pakistan. An article in the Financial Times on 29 December 2025 ("The wildcat traders and US contractors piling into Pakistan's antimony"), includes comments attributed to the Company's CEO, Mr Christopher Gerteisen, regarding a potential purchase of over 100 tons of Pakistani antimony.

    1/5/26 6:30:00 AM ET
    $NVA
    Precious Metals
    Basic Materials

    $NVA
    Financials

    Live finance-specific insights

    View All

    Gold Eyes $3,500 as Miners Race to Unlock High-Grade Ounces Before Year-End

    Issued on behalf of RUA GOLD Inc. VANCOUVER, BC, Aug. 5, 2025 /PRNewswire/ -- Equity Insider News Commentary – The upward momentum for gold price projects continues, as the precious metal opened the week above $3,400 after a recent labor data revision. Analysts continue to adjust their gold price forecasts, with the next three months looking to hit $3,500, with Fidelity projecting a potential $4,000 per ounce price by year-end. And it's not just the bullion dealers that stand to benefit, as gold mining majors are already publicly stating they expect bumper profits as gold's prices and volumes surge. In response, gold miners as a group are leading in gains on spot price on the weak US jobs da

    8/5/25 1:02:00 PM ET
    $GORO
    $NVA
    Precious Metals
    Basic Materials

    Gorilla Technology and Nova Minerals Interviews to Air on the RedChip Small Stocks, Big Money(TM) Show on Bloomberg TV

    ORLANDO, FL / ACCESSWIRE / January 3, 2025 / RedChip Companies will air interviews with Gorilla Technology Group, Inc. (NASDAQ:GRRR) and Nova Minerals Limited (NASDAQ:NVA)(ASX:NVA) on the RedChip Small Stocks, Big Money™ show, a sponsored program on Bloomberg TV on January 4. Bloomberg TV is available in an estimated 73 million homes across the U.S.Access the interviews in their entirety at:GRRR: https://www.redchip.com/assets/access/grrr_accessNVA: https://www.redchip.com/assets/access/nva_accessIn an exclusive interview, Bruce Bower, interim-CFO of Gorilla Technology, appears on the RedChip Small Stocks Big Money™ show on Bloomberg TV to provide a corporate update. Gorilla Technology is a

    1/3/25 9:00:00 AM ET
    $GRRR
    $NVA
    Computer Software: Prepackaged Software
    Technology
    Precious Metals
    Basic Materials

    Alliance Entertainment and Nova Minerals Interviews to Air on the RedChip Small Stocks, Big Money(TM) Show on Bloomberg TV

    ORLANDO, FL / ACCESSWIRE / October 4, 2024 / RedChip Companies will air interviews with Alliance Entertainment Holding Corporation (NASDAQ:AENT) and Nova Minerals Limited (NASDAQ:NVA) on the RedChip Small Stocks, Big Money™ show, a sponsored program on Bloomberg TV, this Saturday, October 5, at 7 p.m. Eastern Time (ET). Bloomberg TV is available in an estimated 73 million homes across the U.S.Access the interviews in their entirety at:Alliance Entertainment: https://www.redchip.com/assets/access/aent_accessNova Minerals: https://www.redchip.com/assets/access/nva_accessBruce Ogilvie, Executive Chairman of Alliance Entertainment, appears on the RedChip Small Stocks, Big Money™ show on Bloomber

    10/4/24 9:00:00 AM ET
    $AENT
    $BOXL
    $NVA
    Durable Goods
    Consumer Discretionary
    Other Consumer Services
    Real Estate

    $NVA
    Leadership Updates

    Live Leadership Updates

    View All

    Appointment of Non-executive Director

    Anchorage Alaska, June 24, 2025 (GLOBE NEWSWIRE) -- Nova Minerals Limited ("Nova" or the "Company") (NASDAQ:NVA) (ASX: NVA) (FRA: QM3) ) is pleased to announce that Mr. Chaim (Dovi) Berger has been appointed as an Independent Non-Executive Director with effect from 1 July 2025. Mr. Berger is a U.S.-based finance and legal executive with over 10 years of experience structuring and closing complex transactions. He brings a cross-disciplinary background in corporate law, accounting, taxation, and M&A, coupled with hands-on operational experience in high-growth businesses. Mr. Berger has a proven track record in executing strategic acquisitions, ensuring regulatory compliance, and implementin

    6/24/25 6:30:00 AM ET
    $NVA
    Precious Metals
    Basic Materials