Red flags / Material weakness

MPWRMonolithic Power Systems Inc.ElevatedForm 10-Qfiled Nov 3, 4:01 PM ET

Monolithic Power Systems says deferred income tax material weakness remains unremediated at September 30, 2026

In its quarterly report for the period ended September 30, 2026, Monolithic Power Systems states that a material weakness in internal control over financial reporting, first identified during fiscal 2025 year-end close and related to deferred income taxes tied to a one-time foreign tax incentive, was not remediated as of that date. The company concludes its disclosure controls and procedures were not effective as a result, and expects remediation by the end of fiscal 2026 with no assurance on timing. Control weaknesses like this can raise the risk of further restatements or reporting errors, though the company says the financial statements still fairly present results under U.S. GAAP.

“The material weakness in internal control over financial reporting was not remediated as of September 30, 2026.”

What the stock did

From the last close before the filing was public. Market cap now: $55.7B.

1 day
-5.1%
SPY +1.7%
5 days
+2.2%
SPY -0.6%
20 days
Not yet
 

10-K or 10-Q reports a material weakness in internal control that is not fixed. Flags are a screen for filings worth reading, not advice. Read the filing before acting on it.

Other flags on MPWR

FiledStockFlagWhat the filing saysMkt cap5 days20 days
Nov 17, 7:30 PM ETMPWR
Monolithic Power Systems Inc.
Insider selling cluster
ElevatedForm 4
3 officers and directors sold $3.5M of Monolithic Power Systems Inc. stock in 10 days$55.7B--
MPWR: Monolithic Power Systems says deferred income tax material weakness remains unremediated at September 30, 2026 | Quantisnow