Compare · CEPU vs NEE
CEPU vs NEE
Side-by-side comparison of Central Puerto S.A. (CEPU) and NextEra Energy Inc. (NEE): market cap, price performance, sector, and recent activity on the wire.
Summary
- Both CEPU and NEE operate in Electric Utilities: Central (Utilities), so they compete in similar markets.
- NEE is the larger of the two at $178.88B, about 114.6x CEPU ($1.56B).
- NEE has been more active in the news (18 items in the past 4 weeks vs 17 for CEPU).
- NEE has more recent analyst coverage (25 ratings vs 1 for CEPU).
Central Puerto S.A.
Central Puerto S.A. generates and sells electric power to private and public customers in Argentina. It also produces steam. As of December 31, 2020, the company owned and operated five thermal generation plants, one hydroelectric generation plant, and seven wind farms with a total installed capacity of 4,709 MW. Central Puerto S.A. was founded in 1989 and is based in Buenos Aires, Argentina.
NextEra Energy Inc.
NextEra Energy, Inc., through its subsidiaries, generates, transmits, distributes, and sells electric power to retail and wholesale customers in North America. The company generates electricity through wind, solar, nuclear, and fossil fuel, such as coal and natural gas facilities. It also develops, constructs, and operates long-term contracted assets with a focus on renewable generation facilities, electric transmission facilities, and battery storage projects; and owns, develops, constructs, manages and operates electric generation facilities in wholesale energy markets. As of December 31, 2020, the company operated approximately 28,400 megawatts of net generating capacity. It serves approximately 11 million people through approximately 5.6 million customer accounts in the east and lower west coasts of Florida with approximately 76,200 circuit miles of transmission and distribution lines and 673 substations. The company was formerly known as FPL Group, Inc. and changed its name to NextEra Energy, Inc. in 2010. NextEra Energy, Inc. was founded in 1925 and is headquartered in Juno Beach, Florida.
Latest CEPU
- SEC Form 6-K filed by Central Puerto S.A.
- SEC Form 6-K filed by Central Puerto S.A.
- SEC Form 6-K filed by Central Puerto S.A.
- SEC Form 6-K filed by Central Puerto S.A.
- SEC Form 6-K filed by Central Puerto S.A.
- SEC Form 6-K filed by Central Puerto S.A.
- SEC Form 6-K filed by Central Puerto S.A.
- SEC Form 6-K filed by Central Puerto S.A.
- SEC Form 6-K filed by Central Puerto S.A.
- SEC Form 6-K filed by Central Puerto S.A.
Latest NEE
- SEC Form 425 filed by NextEra Energy Inc.
- FPL doubles Saving Steps funding to $30 million to help more customers save energy and money
- NextEra Energy to participate in EEI Financial Conference
- SEC Form 425 filed by NextEra Energy Inc.
- SEC Form 425 filed by NextEra Energy Inc.
- NextEra Energy Inc. filed SEC Form 8-K: Other Events, Completion of Acquisition or Disposition of Assets, Financial Statements and Exhibits
- SEC Form 425 filed by NextEra Energy Inc.
- SEC Form 425 filed by NextEra Energy Inc.
- EVP, Finance & CFO Dunne Michael sold $585,480 worth of shares (6,888 units at $85.00) as part of a pre-agreed trading plan, decreasing direct ownership by 10% to 64,063 units (SEC Form 4)
- NextEra Energy and Dominion Energy strengthen historic Virginia benefits package with additional customer and financial safeguards