Data feeds / Power and gas

CAISO 1207, SIENNA SOLAR FARM

One series from Grid interconnection queues and data-center load requests. Every project in the MISO, SPP, CAISO, ERCOT and NYISO interconnection queues, with a record the day one enters or its status, megawatts or in-service date moves. NYISO's load queue says which requests are data centers, AI data centers or crypto mines, and gas plants filed by data-center developers in ERCOT are flagged, so a 1,935 MW AI campus in St. Lawrence County or a 1.4 GW gas plant for a data center in Hill County shows up here months before a press release.

ERCOT 33INR0005, Bullock Gas

1,400 MW

Nov 30, 00:04 UTC

CAISO 1207, SIENNA SOLAR FARM

Not enough points in this range yet.

800 series in this feed

WINDSTAR I ALTERNATE (CAISO 100)WHITE WING RANCH SOLAR (CAISO 1062)GASKELL WEST (CAISO 1074)LITTLE BEAR 4 (CAISO 1128)LUNA VALLEY SOLAR (CAISO 1129)SCARLET (CAISO 1135)LECONTE ENERGY STORAGE (CAISO 1175)ARATINA SOLAR CENTER 1 (CAISO 1204)SIENNA SOLAR FARM (CAISO 1207)ANTELOPE SOLAR 2 (CAISO 1208)DAYLIGHT (CAISO 1223)SILVER RIDGE MOUNT SIGNAL (CAISO 124)PLUOT (CAISO 1242)POMEGRANATE (CAISO 1243)KYAN SOLAR (CAISO 1260)CORBY (CAISO 1270)DAGGETT SOLAR 3 (CAISO 1314)TAHOE (CAISO 1339)ROCCASECCA BESS (CAISO 1347)ARAMIS POWER PLANT (CAISO 1349)HEARTLAND 1 (CAISO 1379)SANDSTORM WIND POWER (CAISO 138)HEARTLAND 2 (CAISO 1380)LAS CAMAS 1 (CAISO 1382)REDUX SOLAR (CAISO 1389)SONRISA (CAISO 1391)ATLAS COMPLEX (CAISO 1402)ATHOS POWER PLANT (CAISO 1405)BALDY MESA (CAISO 1413)IRONWOOD SOLAR (CAISO 1435)SALOON ENERGY STORAGE (CAISO 1444)LAS CAMAS 3 (CAISO 1456)KEY STORAGE 1 (CAISO 1479)BELLEFIELD SOLAR FARM (CAISO 1510)SANBORN SOLAR 2 (CAISO 1518)BALDY MESA 2 (CAISO 1519)ARIDA SOLAR FARM (CAISO 1522)VULCAN (CAISO 1534)IRVING STORAGE (CAISO 1539)TANAGER STORAGE (CAISO 1550)CORMORANT STORAGE (CAISO 1552)KINGSROAD HYBRID SOLAR (CAISO 1587)PELICANS JAW HYBRID SOLAR (CAISO 1593)BUTTONBUSH SOLAR HYBRID ENERGY CENTER (CAISO 1596)ARATINA SOLAR CENTER 2 (CAISO 1604)AVOCET STORAGE (CAISO 1608)COMMERCE ENERGY STORAGE (CAISO 1611)KESTREL STORAGE (CAISO 1615)GOLDBACK SOLAR CENTER (CAISO 1619)ANGELENO SOLAR FARM (CAISO 1625)HUMIDOR STORAGE 1 (CAISO 1629)BELLEFIELD 2 SOLAR FARM (CAISO 1631)SANBORN HYBRID 3 (CAISO 1632)CALYPSO SOLAR (CAISO 1636)OBERON (CAISO 1642)LYCAN SOLAR (CAISO 1643)DOUBLE BUTTE STORAGE (CAISO 1646)ARIDA 2 SOLAR FARM (CAISO 1647)BONANZA SOLAR (CAISO 1649)ROUGH HAT HYBRID SOLAR (CAISO 1650)YELLOW PINE 3 (CAISO 1654)BONANZA PEAK SOLAR FARM (CAISO 1655)CIMARRON WIND (CAISO 1660)HOODINI (CAISO 1663)SUNRISE BUTTE (CAISO 1667)HARQUAHALA SUNRISE (CAISO 1678)DENALI ENERGY STORAGE (CAISO 1690)POTENTIA-VIRIDI (CAISO 1702)GONZAGA HYBRID (CAISO 1718)HAWKINS SOLAR HYBRID (CAISO 1736)PUFF HYBRID SOLAR (CAISO 1740)CRYSTAL FLATS (CAISO 1744)WINDWALKER OFFSHORE (CAISO 1750)WINSTON HYBRID PV AND BESS (CAISO 1751)COBALT (CAISO 1757)DESERT SANDS (CAISO 1758)GRACE ENERGY CENTER (CAISO 1761)SAPPHIRE SOLAR (CAISO 1764)COMMERCE ENERGY STORAGE 2 (CAISO 1766)ROADHOUSE STORAGE (CAISO 1768)OVERNIGHT SOLAR (CAISO 1774)BELLEFIELD 3 SOLAR FARM (CAISO 1779)WILLOW ROCK ENERGY STORAGE (CAISO 1782)SHOALS ENERGY STORAGE (CAISO 1783)KEYHOLE WIND (CAISO 1784)REXFORD 2 SOLAR FARM (CAISO 1789)SANBORN HYBRID 4 (CAISO 1790)SANBORN 5 HYBRID (CAISO 1791)SEQUOIA (CAISO 1792)ARIDA 3 SOLAR FARM (CAISO 1795)DELAMAR ENERGY STORAGE (CAISO 1796)CALVADA SPRINGS SOLAR (CAISO 1798)ROUGH HAT 2 (CAISO 1799)PURPLE SAGE ENERGY CENTER (CAISO 1800)WATER ROCK SOLAR 1 (CAISO 1801)EAST FIELD ENERGY STORAGE (CAISO 1810)DATELAND ENERGY COMPLEX (CAISO 1812)VIENTO FRONTERIZO (CAISO 1824)TOLENAS (CAISO 1842)WILDHORSE ENERGY CENTER (CAISO 1846)CORBY 2 (CAISO 1854)SEAHAWK STORAGE (CAISO 1865)ALLEGHENY ENERGY STORAGE (CAISO 1872)DELILAH ENERGY STORAGE (CAISO 1875)SPECTRUM ENERGY STORAGE (CAISO 1881)PRESIDIO (CAISO 1887)HOLMAN (CAISO 1889)HARMONY STORAGE 2 (CAISO 1892)PATHFINDER STORAGE (CAISO 1896)BAYLANDS BATTERY (CAISO 1900)GOLDEN FLATS (CAISO 1903)ZORIN STORAGE (CAISO 1911)ESPRESSO (CAISO 1912)BLACK DIAMOND ES2 (CAISO 1914)SHERMAN ENERGY STORAGE (CAISO 1915)ZEUS BESS (CAISO 1920)ALLIUM HYBRID (CAISO 1921)ALTA CASA STORAGE (CAISO 1922)EL REY POWER BANK (CAISO 1928)APACHE STORAGE (CAISO 1930)

Newest value per key

KeyValueObserved
Blue Energy Center - Phase 3 – Steam Stage 2 (ERCOT 33INR0007)1,320 MWNov 30, 00:04 UTC
Liberty Thermal Energy Center (ERCOT 33INR0006)1,400 MWNov 30, 00:04 UTC
Bullock Gas (ERCOT 33INR0005)1,400 MWNov 30, 00:04 UTC
Blue Energy Center - Phase 2b – Steam (ERCOT 32INR0009)475 MWNov 30, 00:04 UTC
H&C WILBARGER POWER II (ERCOT 32INR0008)1,026 MWNov 30, 00:04 UTC
Alpha Power Phase 5 (ERCOT 32INR0007)400 MWNov 30, 00:04 UTC
H&C WILBARGER POWER I (ERCOT 32INR0006)1,026 MWNov 30, 00:04 UTC
Mule Deer Run Gas (ERCOT 32INR0003)1,263 MWNov 30, 00:04 UTC
Radiant Plains Energy Center Solar (ERCOT 32INR0002)100 MWNov 30, 00:04 UTC
Alpha Power Phase 4 (ERCOT 31INR0025)400 MWNov 30, 00:04 UTC
Mule Deer Run Gas III (ERCOT 31INR0022)1,263 MWNov 30, 00:04 UTC
Mule Deer Run Gas II (ERCOT 31INR0021)1,263 MWNov 30, 00:04 UTC
Permian I Natural Gas (ERCOT 31INR0019)1,247 MWNov 30, 00:04 UTC
Permian I Solar (ERCOT 31INR0018)1,126 MWNov 30, 00:04 UTC
SCHNEIDER GAS RICE PHASE 2 (ERCOT 31INR0013)113 MWNov 30, 00:04 UTC
SIM GIDEON GAS RICE (ERCOT 31INR0011)226 MWNov 30, 00:04 UTC
LOST PINES GAS RECIP PHASE 2 (ERCOT 31INR0010)113 MWNov 30, 00:04 UTC
Bell Song Solar 3 (ERCOT 31INR0009)168 MWNov 30, 00:04 UTC
Lonestar Dawn Storage (ERCOT 30INR0176)201 MWNov 30, 00:04 UTC
Lonestar Sun Solar (ERCOT 30INR0175)201 MWNov 30, 00:04 UTC
Whitehorse BESS (ERCOT 30INR0167)201 MWNov 30, 00:04 UTC
Buzzer Butte 2 Solar (ERCOT 30INR0164)243 MWNov 30, 00:04 UTC
Capshaw Solar (ERCOT 30INR0158)450 MWNov 30, 00:04 UTC
Blue Energy Center- Phase 1a - Gas (ERCOT 30INR0150)780 MWNov 30, 00:04 UTC
Hackberry Draw Solar (ERCOT 30INR0146)653 MWNov 30, 00:04 UTC
Alpha Power Phase 3 (ERCOT 30INR0143)400 MWNov 30, 00:04 UTC
Jackrabbit Flats Solar (ERCOT 30INR0141)401 MWNov 30, 00:04 UTC
Enfinity Primrose (ERCOT 30INR0140)200 MWNov 30, 00:04 UTC
Blue Sage Wind (ERCOT 30INR0135)395 MWNov 30, 00:04 UTC
Starfield Energy Storage (ERCOT 30INR0133)122 MWNov 30, 00:04 UTC
Pecos Flats Wind II (ERCOT 30INR0132)508 MWNov 30, 00:04 UTC
Pecos Flats Wind I (ERCOT 30INR0131)507 MWNov 30, 00:04 UTC
Horizon Ridge Wind (ERCOT 30INR0128)407 MWNov 30, 00:04 UTC
Sideoats Solar 3 (ERCOT 30INR0125)168 MWNov 30, 00:04 UTC
Sideoats Solar 2 (ERCOT 30INR0124)168 MWNov 30, 00:04 UTC
Sideoats Solar 1 (ERCOT 30INR0123)168 MWNov 30, 00:04 UTC
Longleaf II Power Station (ERCOT 30INR0114)600 MWNov 30, 00:04 UTC
The Giant Arc I (ERCOT 30INR0113)1,300 MWNov 30, 00:04 UTC
Short River BESS (ERCOT 30INR0112)150 MWNov 30, 00:04 UTC
Tradition BESS (ERCOT 30INR0111)150 MWNov 30, 00:04 UTC

From code

shell
curl -H "Authorization: Bearer $QUANTISNOW_API_KEY" \
  "https://www.quantisnow.com/api/v1/feeds/interconnection-queues/latest?key=CAISO:1207"

# One day of history: signed links to gzip NDJSON files
curl -H "Authorization: Bearer $QUANTISNOW_API_KEY" \
  "https://www.quantisnow.com/api/v1/feeds/interconnection-queues/history?date=2026-11-29"

The key goes in QUANTISNOW_API_KEY. Sign up and it's on the keys page in a minute; Premium and Business read every feed with it.

In Claude, ChatGPT, Cursor and other assistants

Connect our MCP server once and ask about this feed in a chat. Pick your assistant:

MCP serverhttps://www.quantisnow.com/api/v1/mcp
shell
claude mcp add --transport http --scope user quantisnow https://www.quantisnow.com/api/v1/mcp

Start claude, run /mcp, pick quantisnow and sign in.

Then ask

prompt
What is the latest reading for SIENNA SOLAR FARM (CAISO 1207), and how has it moved over the last 7 days? Use the Quantisnow data feed interconnection-queues (Grid interconnection queues and data-center load requests).

The assistant gets four tools: list_data_feeds, data_feed_latest, data_feed_series and data_feed_history. Reading a feed needs Premium or Business; listing feeds is free. Full MCP setup.