Data feeds / Power and gas

CAISO 1339, TAHOE

One series from Grid interconnection queues and data-center load requests. Every project in the MISO, SPP, CAISO, ERCOT and NYISO interconnection queues, with a record the day one enters or its status, megawatts or in-service date moves. NYISO's load queue says which requests are data centers, AI data centers or crypto mines, and gas plants filed by data-center developers in ERCOT are flagged, so a 1,935 MW AI campus in St. Lawrence County or a 1.4 GW gas plant for a data center in Hill County shows up here months before a press release.

CAISO 1402, ATLAS COMPLEX

3,200 MW

Nov 29, 23:44 UTC

CAISO 1339, TAHOE

Not enough points in this range yet.

600 series in this feed

WINDSTAR I ALTERNATE (CAISO 100)WHITE WING RANCH SOLAR (CAISO 1062)GASKELL WEST (CAISO 1074)LITTLE BEAR 4 (CAISO 1128)LUNA VALLEY SOLAR (CAISO 1129)SCARLET (CAISO 1135)LECONTE ENERGY STORAGE (CAISO 1175)ARATINA SOLAR CENTER 1 (CAISO 1204)SIENNA SOLAR FARM (CAISO 1207)ANTELOPE SOLAR 2 (CAISO 1208)DAYLIGHT (CAISO 1223)SILVER RIDGE MOUNT SIGNAL (CAISO 124)PLUOT (CAISO 1242)POMEGRANATE (CAISO 1243)KYAN SOLAR (CAISO 1260)CORBY (CAISO 1270)DAGGETT SOLAR 3 (CAISO 1314)TAHOE (CAISO 1339)ROCCASECCA BESS (CAISO 1347)ARAMIS POWER PLANT (CAISO 1349)HEARTLAND 1 (CAISO 1379)SANDSTORM WIND POWER (CAISO 138)HEARTLAND 2 (CAISO 1380)LAS CAMAS 1 (CAISO 1382)REDUX SOLAR (CAISO 1389)SONRISA (CAISO 1391)ATLAS COMPLEX (CAISO 1402)ATHOS POWER PLANT (CAISO 1405)BALDY MESA (CAISO 1413)IRONWOOD SOLAR (CAISO 1435)SALOON ENERGY STORAGE (CAISO 1444)LAS CAMAS 3 (CAISO 1456)KEY STORAGE 1 (CAISO 1479)BELLEFIELD SOLAR FARM (CAISO 1510)SANBORN SOLAR 2 (CAISO 1518)BALDY MESA 2 (CAISO 1519)ARIDA SOLAR FARM (CAISO 1522)VULCAN (CAISO 1534)IRVING STORAGE (CAISO 1539)TANAGER STORAGE (CAISO 1550)CORMORANT STORAGE (CAISO 1552)KINGSROAD HYBRID SOLAR (CAISO 1587)PELICANS JAW HYBRID SOLAR (CAISO 1593)BUTTONBUSH SOLAR HYBRID ENERGY CENTER (CAISO 1596)ARATINA SOLAR CENTER 2 (CAISO 1604)AVOCET STORAGE (CAISO 1608)COMMERCE ENERGY STORAGE (CAISO 1611)KESTREL STORAGE (CAISO 1615)GOLDBACK SOLAR CENTER (CAISO 1619)ANGELENO SOLAR FARM (CAISO 1625)HUMIDOR STORAGE 1 (CAISO 1629)BELLEFIELD 2 SOLAR FARM (CAISO 1631)SANBORN HYBRID 3 (CAISO 1632)CALYPSO SOLAR (CAISO 1636)OBERON (CAISO 1642)LYCAN SOLAR (CAISO 1643)DOUBLE BUTTE STORAGE (CAISO 1646)ARIDA 2 SOLAR FARM (CAISO 1647)BONANZA SOLAR (CAISO 1649)ROUGH HAT HYBRID SOLAR (CAISO 1650)YELLOW PINE 3 (CAISO 1654)BONANZA PEAK SOLAR FARM (CAISO 1655)CIMARRON WIND (CAISO 1660)HOODINI (CAISO 1663)SUNRISE BUTTE (CAISO 1667)HARQUAHALA SUNRISE (CAISO 1678)DENALI ENERGY STORAGE (CAISO 1690)POTENTIA-VIRIDI (CAISO 1702)GONZAGA HYBRID (CAISO 1718)HAWKINS SOLAR HYBRID (CAISO 1736)PUFF HYBRID SOLAR (CAISO 1740)CRYSTAL FLATS (CAISO 1744)WINDWALKER OFFSHORE (CAISO 1750)WINSTON HYBRID PV AND BESS (CAISO 1751)COBALT (CAISO 1757)DESERT SANDS (CAISO 1758)GRACE ENERGY CENTER (CAISO 1761)SAPPHIRE SOLAR (CAISO 1764)COMMERCE ENERGY STORAGE 2 (CAISO 1766)ROADHOUSE STORAGE (CAISO 1768)OVERNIGHT SOLAR (CAISO 1774)BELLEFIELD 3 SOLAR FARM (CAISO 1779)WILLOW ROCK ENERGY STORAGE (CAISO 1782)SHOALS ENERGY STORAGE (CAISO 1783)KEYHOLE WIND (CAISO 1784)REXFORD 2 SOLAR FARM (CAISO 1789)SANBORN HYBRID 4 (CAISO 1790)SANBORN 5 HYBRID (CAISO 1791)SEQUOIA (CAISO 1792)ARIDA 3 SOLAR FARM (CAISO 1795)DELAMAR ENERGY STORAGE (CAISO 1796)CALVADA SPRINGS SOLAR (CAISO 1798)ROUGH HAT 2 (CAISO 1799)PURPLE SAGE ENERGY CENTER (CAISO 1800)WATER ROCK SOLAR 1 (CAISO 1801)EAST FIELD ENERGY STORAGE (CAISO 1810)DATELAND ENERGY COMPLEX (CAISO 1812)VIENTO FRONTERIZO (CAISO 1824)TOLENAS (CAISO 1842)WILDHORSE ENERGY CENTER (CAISO 1846)CORBY 2 (CAISO 1854)SEAHAWK STORAGE (CAISO 1865)ALLEGHENY ENERGY STORAGE (CAISO 1872)DELILAH ENERGY STORAGE (CAISO 1875)SPECTRUM ENERGY STORAGE (CAISO 1881)PRESIDIO (CAISO 1887)HOLMAN (CAISO 1889)HARMONY STORAGE 2 (CAISO 1892)PATHFINDER STORAGE (CAISO 1896)BAYLANDS BATTERY (CAISO 1900)GOLDEN FLATS (CAISO 1903)ZORIN STORAGE (CAISO 1911)ESPRESSO (CAISO 1912)BLACK DIAMOND ES2 (CAISO 1914)SHERMAN ENERGY STORAGE (CAISO 1915)ZEUS BESS (CAISO 1920)ALLIUM HYBRID (CAISO 1921)ALTA CASA STORAGE (CAISO 1922)EL REY POWER BANK (CAISO 1928)APACHE STORAGE (CAISO 1930)

Newest value per key

KeyValueObserved
SUNSHINE VALLEY SOLAR 1 (CAISO 993)50 MWNov 29, 23:44 UTC
RIO BRAVO SOLAR 2 (CAISO 972)20 MWNov 29, 23:44 UTC
CPC WEST (CAISO 96)600 MWNov 29, 23:44 UTC
RIO BRAVO SOLAR 1 (CAISO 900)20 MWNov 29, 23:44 UTC
BOTTLE ROCK POWER (CAISO 81)52 MWNov 29, 23:44 UTC
WRIGHT SOLAR (CAISO 779)200 MWNov 29, 23:44 UTC
BIG SKY SOLAR (CAISO 768)320 MWNov 29, 23:44 UTC
REDWOOD SOLAR FARM (CAISO 744)90 MWNov 29, 23:44 UTC
LASSEN LODGE HYDROELECTRIC (CAISO 720)5 MWNov 29, 23:44 UTC
BLUEWATER RENEWABLE ENERGY STORAGE (CAISO 72)500 MWNov 29, 23:44 UTC
EXCELSIOR SOLAR (FKA: BURFORD FIVE POINTS) (CAISO 678)60 MWNov 29, 23:44 UTC
PUMPJACK SOLAR I (AKA PIONEER SOLAR I) (CAISO 653B)20 MWNov 29, 23:44 UTC
NORTH ROSAMOND SOLAR (CAISO 643R)153 MWNov 29, 23:44 UTC
KETTLEMAN SOLAR PROJECT (FKA KETTLEMAN SOLAR FARM) (CAISO 625)20 MWNov 29, 23:44 UTC
FRESNO COGENERATION EXPANSION PROJECT (CAISO 61)73 MWNov 29, 23:44 UTC
TRACY - ADDITIONAL CAPACITY (CAISO 606)20 MWNov 29, 23:44 UTC
MIDWAY PEAKING (CAISO 54)120 MWNov 29, 23:44 UTC
CROW CREEK SOLAR 1 (FKA: FRONTIER SOLAR 1) (FKA AS SCATEC WESTSIDE SOLAR RANCH I AND STANISLAUS PV - PHASE 1) (CAISO 539)20 MWNov 29, 23:44 UTC
ROSAMOND WEST SOLAR (CAISO 506)300 MWNov 29, 23:44 UTC
OCOTILLO EXPRESS (CAISO 493)265 MWNov 29, 23:44 UTC
LOS ESTEROS CRITICAL ENERGY FACILITY EXPANSION (CAISO 378)120 MWNov 29, 23:44 UTC
CUYAMA SOLAR (CAISO 356)40 MWNov 29, 23:44 UTC
TULE WIND (CAISO 32)194 MWNov 29, 23:44 UTC
ALTA VISTA SUNTOWER GENERATING STATION (CAISO 297)66 MWNov 29, 23:44 UTC
AMERICAN KINGS SOLAR (CAISO 272)123 MWNov 29, 23:44 UTC
TRACY COMBINED-CYCLE POWER PLANT (CAISO 268)145 MWNov 29, 23:44 UTC
MONTEZUMA II (CAISO 222)78 MWNov 29, 23:44 UTC
MONTEZUMA (HIGH WINDS III) (CAISO 22)38 MWNov 29, 23:44 UTC
GATEWAY ENERGY STORAGE 2 (CAISO 2185)250 MWNov 29, 23:44 UTC
BOULDER BRUSH HYBRID (CAISO 2177)400 MWNov 29, 23:44 UTC
DESERT JEWEL STORAGE (CAISO 2173)200 MWNov 29, 23:44 UTC
UMBRIEL (CAISO 2166)1,150 MWNov 29, 23:44 UTC
ALISA SOLAR ENERGY COMPLEX (CAISO 2161)200 MWNov 29, 23:44 UTC
REMY (CAISO 2154)300 MWNov 29, 23:44 UTC
LARREA SOLAR (CAISO 2150)300 MWNov 29, 23:44 UTC
SUNBAKED SOLAR (CAISO 2149)500 MWNov 29, 23:44 UTC
MOSEY (CAISO 2148)500 MWNov 29, 23:44 UTC
KAWICH (CAISO 2147)350 MWNov 29, 23:44 UTC
WATER ROCK SOLAR 2 (CAISO 2146)500 MWNov 29, 23:44 UTC
ROCK VALLEY ENERGY CENTER (CAISO 2144)500 MWNov 29, 23:44 UTC

From code

shell
curl -H "Authorization: Bearer $QUANTISNOW_API_KEY" \
  "https://www.quantisnow.com/api/v1/feeds/interconnection-queues/latest?key=CAISO:1339"

# One day of history: signed links to gzip NDJSON files
curl -H "Authorization: Bearer $QUANTISNOW_API_KEY" \
  "https://www.quantisnow.com/api/v1/feeds/interconnection-queues/history?date=2026-11-29"

The key goes in QUANTISNOW_API_KEY. Sign up and it's on the keys page in a minute; Premium and Business read every feed with it.

In Claude, ChatGPT, Cursor and other assistants

Connect our MCP server once and ask about this feed in a chat. Pick your assistant:

MCP serverhttps://www.quantisnow.com/api/v1/mcp
shell
claude mcp add --transport http --scope user quantisnow https://www.quantisnow.com/api/v1/mcp

Start claude, run /mcp, pick quantisnow and sign in.

Then ask

prompt
What is the latest reading for TAHOE (CAISO 1339), and how has it moved over the last 7 days? Use the Quantisnow data feed interconnection-queues (Grid interconnection queues and data-center load requests).

The assistant gets four tools: list_data_feeds, data_feed_latest, data_feed_series and data_feed_history. Reading a feed needs Premium or Business; listing feeds is free. Full MCP setup.