CAISO 1799, ROUGH HAT 2

One series from Grid interconnection queues and data-center load requests. Every project in the MISO, SPP, CAISO, ERCOT and NYISO interconnection queues, with a record the day one enters or its status, megawatts or in-service date moves. NYISO's load queue says which requests are data centers, AI data centers or crypto mines, and gas plants filed by data-center developers in ERCOT are flagged, so a 1,935 MW AI campus in St. Lawrence County or a 1.4 GW gas plant for a data center in Hill County shows up here months before a press release.

NYISO 1743, St. Lawrence Infrastructure 2

1,935 MW

Nov 30, 00:24 UTC

CAISO 1799, ROUGH HAT 2

Not enough points in this range yet.

1,000 series in this feed

WINDSTAR I ALTERNATE (CAISO 100)WHITE WING RANCH SOLAR (CAISO 1062)GASKELL WEST (CAISO 1074)LITTLE BEAR 4 (CAISO 1128)LUNA VALLEY SOLAR (CAISO 1129)SCARLET (CAISO 1135)LECONTE ENERGY STORAGE (CAISO 1175)ARATINA SOLAR CENTER 1 (CAISO 1204)SIENNA SOLAR FARM (CAISO 1207)ANTELOPE SOLAR 2 (CAISO 1208)DAYLIGHT (CAISO 1223)SILVER RIDGE MOUNT SIGNAL (CAISO 124)PLUOT (CAISO 1242)POMEGRANATE (CAISO 1243)KYAN SOLAR (CAISO 1260)CORBY (CAISO 1270)DAGGETT SOLAR 3 (CAISO 1314)TAHOE (CAISO 1339)ROCCASECCA BESS (CAISO 1347)ARAMIS POWER PLANT (CAISO 1349)HEARTLAND 1 (CAISO 1379)SANDSTORM WIND POWER (CAISO 138)HEARTLAND 2 (CAISO 1380)LAS CAMAS 1 (CAISO 1382)REDUX SOLAR (CAISO 1389)SONRISA (CAISO 1391)ATLAS COMPLEX (CAISO 1402)ATHOS POWER PLANT (CAISO 1405)BALDY MESA (CAISO 1413)IRONWOOD SOLAR (CAISO 1435)SALOON ENERGY STORAGE (CAISO 1444)LAS CAMAS 3 (CAISO 1456)KEY STORAGE 1 (CAISO 1479)BELLEFIELD SOLAR FARM (CAISO 1510)SANBORN SOLAR 2 (CAISO 1518)BALDY MESA 2 (CAISO 1519)ARIDA SOLAR FARM (CAISO 1522)VULCAN (CAISO 1534)IRVING STORAGE (CAISO 1539)TANAGER STORAGE (CAISO 1550)CORMORANT STORAGE (CAISO 1552)KINGSROAD HYBRID SOLAR (CAISO 1587)PELICANS JAW HYBRID SOLAR (CAISO 1593)BUTTONBUSH SOLAR HYBRID ENERGY CENTER (CAISO 1596)ARATINA SOLAR CENTER 2 (CAISO 1604)AVOCET STORAGE (CAISO 1608)COMMERCE ENERGY STORAGE (CAISO 1611)KESTREL STORAGE (CAISO 1615)GOLDBACK SOLAR CENTER (CAISO 1619)ANGELENO SOLAR FARM (CAISO 1625)HUMIDOR STORAGE 1 (CAISO 1629)BELLEFIELD 2 SOLAR FARM (CAISO 1631)SANBORN HYBRID 3 (CAISO 1632)CALYPSO SOLAR (CAISO 1636)OBERON (CAISO 1642)LYCAN SOLAR (CAISO 1643)DOUBLE BUTTE STORAGE (CAISO 1646)ARIDA 2 SOLAR FARM (CAISO 1647)BONANZA SOLAR (CAISO 1649)ROUGH HAT HYBRID SOLAR (CAISO 1650)YELLOW PINE 3 (CAISO 1654)BONANZA PEAK SOLAR FARM (CAISO 1655)CIMARRON WIND (CAISO 1660)HOODINI (CAISO 1663)SUNRISE BUTTE (CAISO 1667)HARQUAHALA SUNRISE (CAISO 1678)DENALI ENERGY STORAGE (CAISO 1690)POTENTIA-VIRIDI (CAISO 1702)GONZAGA HYBRID (CAISO 1718)HAWKINS SOLAR HYBRID (CAISO 1736)PUFF HYBRID SOLAR (CAISO 1740)CRYSTAL FLATS (CAISO 1744)WINDWALKER OFFSHORE (CAISO 1750)WINSTON HYBRID PV AND BESS (CAISO 1751)COBALT (CAISO 1757)DESERT SANDS (CAISO 1758)GRACE ENERGY CENTER (CAISO 1761)SAPPHIRE SOLAR (CAISO 1764)COMMERCE ENERGY STORAGE 2 (CAISO 1766)ROADHOUSE STORAGE (CAISO 1768)OVERNIGHT SOLAR (CAISO 1774)BELLEFIELD 3 SOLAR FARM (CAISO 1779)WILLOW ROCK ENERGY STORAGE (CAISO 1782)SHOALS ENERGY STORAGE (CAISO 1783)KEYHOLE WIND (CAISO 1784)REXFORD 2 SOLAR FARM (CAISO 1789)SANBORN HYBRID 4 (CAISO 1790)SANBORN 5 HYBRID (CAISO 1791)SEQUOIA (CAISO 1792)ARIDA 3 SOLAR FARM (CAISO 1795)DELAMAR ENERGY STORAGE (CAISO 1796)CALVADA SPRINGS SOLAR (CAISO 1798)ROUGH HAT 2 (CAISO 1799)PURPLE SAGE ENERGY CENTER (CAISO 1800)WATER ROCK SOLAR 1 (CAISO 1801)EAST FIELD ENERGY STORAGE (CAISO 1810)DATELAND ENERGY COMPLEX (CAISO 1812)VIENTO FRONTERIZO (CAISO 1824)TOLENAS (CAISO 1842)WILDHORSE ENERGY CENTER (CAISO 1846)CORBY 2 (CAISO 1854)SEAHAWK STORAGE (CAISO 1865)ALLEGHENY ENERGY STORAGE (CAISO 1872)DELILAH ENERGY STORAGE (CAISO 1875)SPECTRUM ENERGY STORAGE (CAISO 1881)PRESIDIO (CAISO 1887)HOLMAN (CAISO 1889)HARMONY STORAGE 2 (CAISO 1892)PATHFINDER STORAGE (CAISO 1896)BAYLANDS BATTERY (CAISO 1900)GOLDEN FLATS (CAISO 1903)ZORIN STORAGE (CAISO 1911)ESPRESSO (CAISO 1912)BLACK DIAMOND ES2 (CAISO 1914)SHERMAN ENERGY STORAGE (CAISO 1915)ZEUS BESS (CAISO 1920)ALLIUM HYBRID (CAISO 1921)ALTA CASA STORAGE (CAISO 1922)EL REY POWER BANK (CAISO 1928)APACHE STORAGE (CAISO 1930)

Newest value per key

KeyValueObserved
NYISO NOTES:, generationNov 30, 00:24 UTC
NY37 Solar (NYISO CR26-1003)Nov 30, 00:24 UTC
East Setauket Energy Storage (NYISO CR26-1002)Nov 30, 00:24 UTC
Arthur Kill Unit 2 Uprate (NYISO CR24-1004)Nov 30, 00:24 UTC
Bethlehem Energy Center Uprate (NYISO CR24-1003)Nov 30, 00:24 UTC
West Babylon Internal Combustion (IC), Unit 4 (NYISO CR24-1002)Nov 30, 00:24 UTC
Hudson Valley Energy Storage B (NYISO C26-0066)117 MWNov 30, 00:24 UTC
Hudson Valley Energy Storage A (NYISO C26-0065)117 MWNov 30, 00:24 UTC
KCE NY 37 (NYISO C26-0064)150 MWNov 30, 00:24 UTC
KCE NY 31 (NYISO C26-0063)50 MWNov 30, 00:24 UTC
Selkirk Shores BESS (NYISO C26-0057)300 MWNov 30, 00:24 UTC
Brooks Road BESS (NYISO C26-0056)400 MWNov 30, 00:24 UTC
Roseton Energy Storage (NYISO C26-0055)330 MWNov 30, 00:24 UTC
East Setauket Storage II (NYISO C26-0054)248 MWNov 30, 00:24 UTC
EF Barrett - 2 (NYISO C26-0053)627 MWNov 30, 00:24 UTC
Tibbits Creek (NYISO C26-0052)127 MWNov 30, 00:24 UTC
Gowanus Gas Turbine Facility Repowering (NYISO C26-0051)448 MWNov 30, 00:24 UTC
Slide Energy Center (NYISO C26-0050)120 MWNov 30, 00:24 UTC
Headland Energy Storage (NYISO C26-0049)200 MWNov 30, 00:24 UTC
BECII Unit B (NYISO C26-0048)800 MWNov 30, 00:24 UTC
BECII Unit A (NYISO C26-0047)1,239 MWNov 30, 00:24 UTC
More Cow Bell BESS (NYISO C26-0045)100 MWNov 30, 00:24 UTC
Sullivan Storage BESS (NYISO C26-0044)200 MWNov 30, 00:24 UTC
Farmhouse BESS (NYISO C26-0043)100 MWNov 30, 00:24 UTC
Adirondack Energy Storage Center (NYISO C26-0042)500 MWNov 30, 00:24 UTC
Moose Walk (NYISO C26-0041)220 MWNov 30, 00:24 UTC
Fairview Summit Energy Storage (NYISO C26-0040)245 MWNov 30, 00:24 UTC
Meredith (NYISO C26-0039)118 MWNov 30, 00:24 UTC
Marcy BESS (NYISO C26-0038)200 MWNov 30, 00:24 UTC
Warners Road BESS (NYISO C26-0037)150 MWNov 30, 00:24 UTC
Downsville Wind (NYISO C26-0032)200 MWNov 30, 00:24 UTC
Bay Breeze solar (NYISO C26-0030)150 MWNov 30, 00:24 UTC
Patriot Forge Energy Center (NYISO C26-0029-2)350 MWNov 30, 00:24 UTC
Northport Power Station (NYISO C26-0028)427 MWNov 30, 00:24 UTC
EF Barrett - 1 (NYISO C26-0027)427 MWNov 30, 00:24 UTC
Fort Edward Solar Farm (NY53) (NYISO C26-0026)100 MWNov 30, 00:24 UTC
Riptide Storage (NYISO C26-0025)200 MWNov 30, 00:24 UTC
Cohocton (NYISO C26-0024)130 MWNov 30, 00:24 UTC
Clay Energy Storage 2 (NYISO C26-0023)150 MWNov 30, 00:24 UTC
Clay Energy Storage 1 (NYISO C26-0022)250 MWNov 30, 00:24 UTC

From code

shell
curl -H "Authorization: Bearer $QUANTISNOW_API_KEY" \
  "https://www.quantisnow.com/api/v1/feeds/interconnection-queues/latest?key=CAISO:1799"

# One day of history: signed links to gzip NDJSON files
curl -H "Authorization: Bearer $QUANTISNOW_API_KEY" \
  "https://www.quantisnow.com/api/v1/feeds/interconnection-queues/history?date=2026-11-29"

The key goes in QUANTISNOW_API_KEY. Sign up and it's on the keys page in a minute; Premium and Business read every feed with it.

In Claude, ChatGPT, Cursor and other assistants

Connect our MCP server once and ask about this feed in a chat. Pick your assistant:

MCP serverhttps://www.quantisnow.com/api/v1/mcp
shell
claude mcp add --transport http --scope user quantisnow https://www.quantisnow.com/api/v1/mcp

Start claude, run /mcp, pick quantisnow and sign in.

Then ask

prompt
What is the latest reading for ROUGH HAT 2 (CAISO 1799), and how has it moved over the last 7 days? Use the Quantisnow data feed interconnection-queues (Grid interconnection queues and data-center load requests).

The assistant gets five tools: list_data_feeds, data_feed_latest, data_feed_series, data_feed_history and data_feed_signals. Reading a feed needs Premium or Business; listing feeds is free. Full MCP setup.